Jesús Novais Pérez

Responsable de compras at Prosolia Energy
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Valencian Community, Spain, ES

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Spain
    • Solar Electric Power Generation
    • 100 - 200 Employee
    • Responsable de compras
      • Dec 2018 - Present

      Responsable de Compras ( ENERGÍA SOLAR FOTOVOLTAICA) - Responsable de Compras de los equipos/ componentes: • Paneles solares: DDP, DAP • Estructuras Metálicas:  Fabricación de Marquesinas  Fabricación de Naves / hangares fotovoltaicos (Francia) Fabricación estructuras de Suelo Inversores string Centros de transformación • Sistemas de Integración • Cuadros Eléctricos • Cable AC & DC • Líneas de vida, etc. - Responsable de compras de prestaciones /servicios / subcontratas: • Montaje Eléctrico (Sistema de integración, paneles, cuadros, cableado) • Montaje Mecánico (Naves, marquesinas & estructuras de suelo) • Obra Civil Transporte (camión completo y grupaje) Almacenes - Negociación de condiciones de pago. - Redacción de contratos: Condiciones, cláusulas, etc. - Supply chain management Show less

  • CLEAR CHANNEL INTERNATIONAL LIMITED
    • Nimes y alrededores, Francia
    • Digital Project Manager
      • Jul 2016 - Sep 2017

      Project Manager / Chef de projet (Digital) : Mobilier Urbain / Communication extérieur. Entreprise : CLEAR CHANNEL INTERNATIONAL - Gestion du projet, et accomplissement du contrat en termes de QCD (Quality ; Cost ; Delivery). Master Production Schedule (planning) management. - Supply chain (chaine d’approvisionnement) : Europe & Chine. - Principaux projets : Suède (1 M€) ; Belgique (2 M€) ; France (1.5 M€) ; Espagne (5 M€); Singapore (0.5 M€). - Lien direct entre les client finaux et fournisseurs. - Résolution de la PLUS IMPORTANTE non conformité de la société CCI : notamment, 6500 dispositifs LED poster défaillants depuis des années, dont 3500 à Madrid et 3000 en Europe. (Solution technique et Retrofit Master plan organisé). - Totems digitaux et traditionnels (2 m2) : affiche / poster et cassette déroulante (scroller). - Intégration de totems digitaux dans des abris de voyageurs. - Retrofit du mobilier urbain : digitalisation (de traditionnel à digital) - Abris de voyageurs : nouvelles installations ainsi que renouvellement ; et / ou digitalisation. Show less

    • Spain
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Project Manager
      • May 2015 - Dec 2015

      Project Manager: Proyectos llave en mano: Sistemas By-pass (Dampers). Empresa: STEJASA - Responsable de proyectos EPC: Sistemas de By-pass (Dampers – chimeneas). - Gestión del proyecto, y velar por el cumplimiento del contrato. Master Production Schedule. - Supervisión de la fabricación en las distintas plantas de los partners. Pruebas F.A.T. con cliente final. - Revisión de la Ingeniería. - Clientes finales: OHL; Técnicas Reunidas; Sener; Duro Felguera, etc. Project Manager: Proyectos llave en mano: Sistemas By-pass (Dampers). Empresa: STEJASA - Responsable de proyectos EPC: Sistemas de By-pass (Dampers – chimeneas). - Gestión del proyecto, y velar por el cumplimiento del contrato. Master Production Schedule. - Supervisión de la fabricación en las distintas plantas de los partners. Pruebas F.A.T. con cliente final. - Revisión de la Ingeniería. - Clientes finales: OHL; Técnicas Reunidas; Sener; Duro Felguera, etc.

    • Construction
    • 700 & Above Employee
    • Manager Mechanical Engineering
      • Jul 2013 - Feb 2015

      Manager Mechanical Engineering. EPC: Rehabilitation of Hydroelectric Plant INGA 1 (70M€) –Democratic Republic of Congo – 120 MW – ELECNOR. Consortium: Voith - Elecnor - In charge of purchasing of goods, following planning and technical specifications. - In charge of Logistics of goods; Import of goods into R.D.C. - Management of the project; looking after the accomplishment and respect of the contract. - Presentation of technical propositions to the final client. - Extra-scope technical propositions. - Meeting with client, partner (division of works) and suppliers. - Revision of engineering technical propositions. Follow-up of purchased equipments. - Managing of subcontractors (looking after works and their achievement), and of our teams. Show less

  • ERION, Mantenimiento Ferroviario
    • Estación de Cercanías de Fuencarral (MADRID)
    • Technical support Engineer, ERION RAILWAY MAINTENANCE
      • May 2012 - Oct 2012

      Main activities: - In charge of technical monitoring and follow-up of rail vehicles, and supervising maintenance operations (foreseeing and correcting). Diesel – electric locomotives types: Euro 4000, 333 y 334 (Renfe) - Management of a work team: 15 – 25 workers - Preparation of budgets and technical reports for breakdowns. Main activities: - In charge of technical monitoring and follow-up of rail vehicles, and supervising maintenance operations (foreseeing and correcting). Diesel – electric locomotives types: Euro 4000, 333 y 334 (Renfe) - Management of a work team: 15 – 25 workers - Preparation of budgets and technical reports for breakdowns.

  • EUROPAC, Papeles y Cartones de Europa
    • Dueñas, PALENCIA (España)
    • Industrial Engineer
      • Apr 2011 - Sep 2011

      Main activities: - Studies on energy efficiency. - Manager in charge of paper winder. - Continuous evaluation/improvement process - Development of a database on production factor indicators. -Big picture view of all processes (waste water treatment plant, cogeneration, pulp preparation, paper machines and maintenance) Main activities: - Studies on energy efficiency. - Manager in charge of paper winder. - Continuous evaluation/improvement process - Development of a database on production factor indicators. -Big picture view of all processes (waste water treatment plant, cogeneration, pulp preparation, paper machines and maintenance)

    • Spain
    • Renewable Energy Power Generation
    • 700 & Above Employee
    • Industrial Engineer (technical departament)
      • Aug 2009 - Feb 2010

      Main activities: - Wind site assessment: Analysis of wind energy production; wind farm reports - Wind Farm Engineering: layout of the wind farms and creating construction plans - Creating and compiling documents for construction tender. - Wind power resource: Calculation of wind power produced by a wind farm - Prospecting: Analysis of potentials sites to implant Wind farms (Greenfield). Main activities: - Wind site assessment: Analysis of wind energy production; wind farm reports - Wind Farm Engineering: layout of the wind farms and creating construction plans - Creating and compiling documents for construction tender. - Wind power resource: Calculation of wind power produced by a wind farm - Prospecting: Analysis of potentials sites to implant Wind farms (Greenfield).

    • Professional training
      • Oct 2007 - Jun 2008

      Selected under the Erasmus programme to carry out the final project within the Ecole Polytechnique Universitaire of Montpellier in collaboration with Saint Dizier Environment Company. Montpellier (France). Final Project: « Process followed by a compact non-collective sewage system ». Main activities and responsibilities: Follow-up, maintenance and improvement of a non-collective sewage system Selected under the Erasmus programme to carry out the final project within the Ecole Polytechnique Universitaire of Montpellier in collaboration with Saint Dizier Environment Company. Montpellier (France). Final Project: « Process followed by a compact non-collective sewage system ». Main activities and responsibilities: Follow-up, maintenance and improvement of a non-collective sewage system

Education

  • Universidad de Vigo
    Industrial Engineer
    2001 - 2008

Community

You need to have a working account to view this content. Click here to join now