TAISEER FAWAS ,B.Tech, PMP®

Equipment Sales and Proposal Engineer at Hamon Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Dubai, Dubai, United Arab Emirates, AE
Languages
  • English Native or bilingual proficiency
  • Hindi Native or bilingual proficiency
  • Malayalam Native or bilingual proficiency
  • Arabic Limited working proficiency
  • Tamil Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Jayalakshmi Coppisetty

I have pleasure in recommending Taiseer, he is a very talented and a dedicated individual wearing a very graceful smile ever. His understanding of the team work along with the targets are commendable. He is an amazing listner and a best teammate to work with. Absolutely a great asset to any organization at ant point of time. I wish him all the very best in all his future endeavours 👍🌷👍

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Belgium
    • Industrial Machinery Manufacturing
    • 200 - 300 Employee
    • Equipment Sales and Proposal Engineer
      • Sep 2021 - Present

      Helping the companies to cool their liquid in an efficient cost effective manner.Areas of work:☆ WID Selections ☆ Technical Documentation ☆ Budgeting ☆ Estimation ☆ Technical Compliances ☆ Roles & Responsibilities: Direct and control the activities for carrying out installation, erection, maintenance,commissioning, and testing of cooling towers, gearbox, motor, pump, fan blades andgantry cranes – District Cooling Plant, Utility Plant, Industrial/Chemical Plant. Preparation of primary documents corresponding to design basis and specifications ofequipment Preparation of equipment data sheets (FEED & Projects), requisition of quotations,vendor offer study, bid clarification, offer evaluation and coordination with interdisciplines.  Document preparation adherence to ASHRAE and ASME PTC 23 standards Equipment selection adherence to CTI standards including CTI ATC‐128, CTI ATC‐133, CTISTD 131, CTI STD‐201 and NFPA 214 standards for water cooling towers. Coordinate with PM on all sub‐contractor scheduling and material delivery.Maintenance and reliability coordination with plant managers.  Preparation of Spare Parts and Interchangeability Record (SPIR) for the plant incoordination with vendors, maintenance team and plant managers. Preparation and lodging equipment performance curve, CTI capability sheet, Spare partslist.Managing associated cost preparation responsibilities.Preparing technical & commercial proposals.Attending clarification meetings with Client when required.Ensuring that tenders meet company commercial guidelines and have the necessary sign off in accordance with the delegation of authority guidelines..Participating in and actively supporting company initiatives..Familiarizing with the risks and hazards within the activities and processesSkills: Price Quotes · RFP · Project Estimation · Vendor Management · Supply Chain Management Show less

    • Project Engineer
      • Aug 2018 - Sep 2021

      Handling Projects in UAE, Saudi Arabia, Oman, Bahrain, and Qatar.1. Direct and control the activities for carrying out installation, erection, maintenance, commissioning, and testing of cooling towers, motor, gearbox, fan and gantry cranes.2. Review of Engineering Drawings and consolidations of BOM, sending RFQs and negotiation of orders to suppliers3. Coordinate with sub-contractor for scheduling and material delivery. Monitor and supervise sub-contractors on site.4. Coordinate with main contractor, consultant and sub contractors about project schedules and deliveries5. Conduct regular quality checks during CT installation and prepare NCR for any deviation found at site.6. Oversee the CT final commissioning 7. Submit weekly progress report to PM and Clients as needed Show less

    • Project Engineer
      • Nov 2016 - Jul 2018

      Projects:1. Dubai Metro - Expo2020 ExpansionMaintain progress report; track all checklist reports and submitting in timely manner Supporting the workforce capacity planning and steering activities  Order surveys, ensure schedules are accurate, order field staff equipment (safety, tools, etc)  Ensuring dependencies are constantly identified and addressed  Daily updates on upcoming events and status of work in progress  Review/Distribute/act upon incoming departmental mail; prepare Department correspondence, agendas and minutes. 2. Sharjah International Airport - Cabin Crew TerminalSupervision over HVAC ducts fabrication and installation.  Study Contract drawings, with respect to the BOQ and specifications, and notifying QS for variations/addition in quantities, if any.  Notifying client the technical discrepancies (via. TQ) found between Contract BOQ/Drawings/Specifications, and follow-up for TQ approvals.  Coordinate with the design consultant on all aspects of the design.  Review utility Shop Drawings, and prepare Material Submittal Work Method Statement/ITP’s and reply to Engineer’s comments if any and follow-ups until approval.  Technical evaluation and co-ordination with procurement dept. for subsequent negotiation and procurement of major MEP equipment Preparation of schedules and resource requirements to planning. Daily reports, Progress updates every week to planning, to reconcile the cumulative works done.  Daily discussion with site engineers/foreman to monitor daily works achieved, to understand site requirements for achieving un-interrupted works at site.  Maintains project schedule by monitoring project progress, coordinating activities, resolving problems.  Writing/replying letters to Engineer/Client in consultation with Project Manager for, drawings, Engineering documents & technical related issues.  Controls project plan by reviewing design, specifications, and plan and schedule changes, recommending actions. Show less

    • Planning
      • Nov 2016 - Jul 2018

      Planning:1. Air Arabia Cabin Crew Terminal2. Latifa Hospital - Expansion Project3. Sohar III IPP (1516MW) 4. Al Kamali Hotel Project (Dubai) • Preparation of Project Schedule (Tools used: Primavera, MS Excel) covering entire scope and within defined timelines • Calculating Optimal Material requirement, Manpower Requirement (of various trades) & Machinery Requirement • Plan for budget required for the project and create various budget heads to document and monitor the expenses • Create Cash flow analysis (ie., Expected billing (cash inflow) vs Expected cash outflow) • Co-ordinate with various departments like Engineering (who provides working drawings), Procurement (who buys materials), Contracts (who awards contracts & raise any issues with the client), quality (who maintains ) & Commissioning Departments • Collect periodic updates and prepare daily, weekly and monthly updates of the project • Create variance reports (Schedule Variance and Cost Variance - usually Earned Value Method (EMV) is used for this) at various stages of the project to analyse deviations • Create Project Closing Reports and Learning Show less

  • Meerja Engineering Consultancy
    • Mangalore Area, India
    • Site Engineer
      • Jun 2016 - Oct 2016

       Review utility Shop Drawings, and prepare Material Submittals, Work Method Statement/ITP’s and reply to Engineer’s comments, if any and follow-ups until approval.  Daily discussion/meeting with other departments, construction/project manager to address any interface issues, so that solutions can be sought.  Review utility Shop Drawings, and prepare Material Submittals, Work Method Statement/ITP’s and reply to Engineer’s comments, if any and follow-ups until approval.  Daily discussion/meeting with other departments, construction/project manager to address any interface issues, so that solutions can be sought.

    • India
    • Writing and Editing
    • 100 - 200 Employee
    • Intern
      • Oct 2015 - Oct 2015

Education

  • University of Calicut
    Engineer’s Degree, Mechanical Engineering
    2012 - 2016
  • INDIAN ISLAHI SCHOOL, ABU DHABI, UAE
    High School, SCIENCE
    2010 - 2012
  • AL NOOR INDIAN SCHOOL, ABU DHABI , UAE
    High School
    2001 - 2010

Community

You need to have a working account to view this content. Click here to join now