𝒱𝒢𝒹𝒾𝓋ℯ𝓁 π’œπ“‡π“Šπ“‚π“Šβ„Šπ’Άπ“‚

Manager at HEAVY METAL AND TUBES (INDIA) PVT LTD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Oil and Gas
    • 1 - 100 Employee
    • Manager
      • Feb 2014 - Present

      Gujarat, India Maintenance and Projects

    • Maintenance Manager
      • Mar 2014 - Feb 2022

      Gujarat, India ο‚· Responsible for the design programming troubleshooting and reporting of PLC systems Integrations for Production Automation. ο‚· Develop and maintain systems preventive and predictive maintenance schedules lead and assist in system troubleshooting and repairs. ο‚· Reviews and validates PLC/SCADA, software programming, logic, operation and functionality. ο‚· Ability to understand and explain technical information and to train others. ο‚· Planning, directing and controlling efforts to… Show more ο‚· Responsible for the design programming troubleshooting and reporting of PLC systems Integrations for Production Automation. ο‚· Develop and maintain systems preventive and predictive maintenance schedules lead and assist in system troubleshooting and repairs. ο‚· Reviews and validates PLC/SCADA, software programming, logic, operation and functionality. ο‚· Ability to understand and explain technical information and to train others. ο‚· Planning, directing and controlling efforts to provide necessary training to provide skilled and unskilled people of the Maintenance Team. ο‚· Engage with Mechanical/Electrical and Automation Team/ Contractor on site. ο‚· To coordinate all concerned departments to achieve good results in the maintenance department. ο‚· HSE and Electrical safety code to follow inside the plant and housekeeping (IOSH, and OH&S). ο‚· Try to minimize Electrical break down in total plant break down maintenance analysis. ο‚· Knowledge of design building systems (MEP), technologies, and greenery building with high performance safety and HVAC system Projects and Maintenance done this company. ο‚· To suggest renewable energy to update management to reduce yearly Electricity bills.

    • Electrical Engineer
      • Feb 2012 - Jul 2023

      Pre-insulated pipe process, FRP process, Epoxy paint coating process, related electrical and electronics control equipment maintenance, troubleshooting and arrange critical spares to trading. direct co-ordinate with supplier to resolve major issues, modification of process as per production requirement, with follow safety and as per International electrical standards to all work.

    • Senior Engineer
      • Feb 2010 - Jan 2012

      Senior Project Engineer, seamless pipe manufacturing plant. Process is based on china technology first time in India full plant in automation. RHF, Piercer, SRM, Reheating furnace and NDT testing, automatic painting gun. Every process related Electrical and Electronics Material checking and installation and commissioning done with trial finished.

    • Qatar
    • Newspaper Publishing
    • 1 - 100 Employee
    • Electronics Engineer
      • Nov 2008 - Jan 2010

      Jeddah, KSA ο‚· Maintenance of Synchronous motors and Servo Motors, Operation, Maintenance and Troubleshooting with PPM Console. ο‚· Register Control Station with Multi camera system. ο‚· Operation and Maintenance handle with SIMATIC PLC logo PLC, S7-300, 400. ο‚· If any critical issue, we are facing CALL to GERMAN ONLINE engineers to discuss over there and solve the issues with their guide through access our PPM console through online connection and this is called 4.0 Technology. And after solving the… Show more ο‚· Maintenance of Synchronous motors and Servo Motors, Operation, Maintenance and Troubleshooting with PPM Console. ο‚· Register Control Station with Multi camera system. ο‚· Operation and Maintenance handle with SIMATIC PLC logo PLC, S7-300, 400. ο‚· If any critical issue, we are facing CALL to GERMAN ONLINE engineers to discuss over there and solve the issues with their guide through access our PPM console through online connection and this is called 4.0 Technology. And after solving the problem to give us necessary training. ο‚· Maintain and repair the control systems of the BMS controlled HVAC systems throughout the site as determined by the manufacturers recommended system as detailed by the site management ο‚· Renovate and replace equipment as required by fault finding to maintain equipment in optimal performance condition. HVAC control systems and equipment and modifying or renovating as necessary. ο‚· Checks routinely for correct operation of all equipment in locations that include BMS control of systems. ο‚· Monitor the operation of the HVAC control systems using the BMS to monitor performance. Show less

    • India
    • Mechanical Or Industrial Engineering
    • 200 - 300 Employee
    • Assistant Enginner
      • Oct 2006 - Nov 2008

      Mumbai, India Seamless pipes manufacturing hot rolling mill (real-time Monitoring and controlling) techniques and doing emergency breakdown and following machines maintenance, troubleshooting, maintenance planning and schedules carried out for PLC, Drives, CNC M/s’s conveyor, Billet cutting machines, RHF Furnaces, Piercing, Plug mill, Mandrill bar, cutting saw, lifting conveyors, SRM Drives, cooling bed conveyors, Finishing mill, etc. ο‚· PLC Running time modifications & controlling for Schneider electric… Show more Seamless pipes manufacturing hot rolling mill (real-time Monitoring and controlling) techniques and doing emergency breakdown and following machines maintenance, troubleshooting, maintenance planning and schedules carried out for PLC, Drives, CNC M/s’s conveyor, Billet cutting machines, RHF Furnaces, Piercing, Plug mill, Mandrill bar, cutting saw, lifting conveyors, SRM Drives, cooling bed conveyors, Finishing mill, etc. ο‚· PLC Running time modifications & controlling for Schneider electric system. ο‚· Maintaining identification and trace-ability records of faults. ο‚· Preparing E-CHART Planning for Preventive Maintenance. ο‚· ERP use to plan issue item and calibration details of Instruments for oracle E-business operations. ο‚· Re-Erection of PLC Schneider Electric swap with L&T PLC and Analogue and Digital Drive swap with L & T DC drives. ο‚· Maintaining all IQMS activities within the organization as per ISO standards and Housekeeping. Show less

Education

  • Anna University
    Bachelor of Engineering (B.E.), Electrical and Electronics Engineering
    2001 - 2005
  • R S Govt. Her Sec School, PMK, Tamilnadu, India.
    12 th " standard "
    1999 - 2001

Community

You need to have a working account to view this content. Click here to join now