Jacky Chen
Sr. Project Engineering Manager at 台灣和暄绿能股份有限公司- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
HEXA Renewables
-
Taiwan
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Sr. Project Engineering Manager
-
Aug 2023 - Present
-
-
-
Sinotech Engineering Consultants, Ltd
-
Taiwan
-
Architecture and Planning
-
200 - 300 Employee
-
Project Manager
-
Feb 2020 - Jul 2023
1.VENA Energy - Yunlin Xinxing Power Plant (Solar power plant / 272MWp) PCM (Jan 2021 - Until now) Led a team of 45 people to be Project Control Management (PCM) work on behalf of the owner. The project total investment amount is about 9.5 billion NTD and total construction contract amount is about 3.4 billion NTD, including progress control, quality inspection, SHE management, material management, system commissioning, etc. The project total investment amount is about 9.5 billion NTD and total construction contract amount is about 3.4 billion NTD, including progress control, quality inspection, SHE management, material management, system commissioning, etc. The project has been success fully COD on 26th Aug 2022, and completed one month earlier than the original plan, currently in the final close stage. 2. VENA Energy - Yunlin Xinxing Power Plant (Solar power plant / 272MWp) Pre-construction planning and management project (2020 Feb-2020 Dec) Responsible for pre-bid participation, solar power plant pre-construction schedule planning, material supply schedule estimation, site management and schedule planning, quality inspection management and other planning work. 3. CIP Copenhagen-Zhang fang & West Island Offshore Wind Farm Supervision Project - Submarine Cable Project Supervision (Feb 2020 – May 2020); Responsible for the review of construction quality documents, construction drawings, procedures and procedures for submarine cable manufacturing and type testing of offshore wind power generation submarine cable projects. Show less
-
-
-
-
Deputy Planning Manager
-
Jun 2018 - Dec 2019
GNPK Power Plant, Kauswagan, Lanao del Norte, PhilippinesCoal-fired 150MW*4 Unit (EPC)1. Utilize Oracle Primavera P6 software to consolidate, plan and review EPC disciplines work & activities.2. Conduct weekly data analysis to design, procurement, construction, commissioning status of EPC disciplines, and prepare status report to guide work plans.3. Meeting regularly with Owner Planning manager to discuss the actual construction verse the schedule and to confirm the progress figure to be submitted to the board and lenders.4. Participate project management meetings, construction meetings, commissioning meetings and focus meetings.5. Conduct calculation and changes based on the milestones requirement from SEPC and Owner and prepare new milestone schedule for management decision making.6. In the later stage of the project, responsible for the unit commissioning and operation management as well as maintenance management for two years warranty work. Show less
-
-
Maintenance Manager
-
Feb 2018 - May 2018
Mabar Power Plant, Medan, IndonesiaCoal-fired 150MW*2 Unit (O&M)Feb 2018 - May 20181. Review the plant operation procedures, process, standard operation guideline, maintenance instructions.2. Conduct inspection to plant major equipment, supervise and control equipment site installation and quality.3. In charge of personnel recruiting, training plan, execution and management of maintenance department.4. Prepare bidding documents for O&M or EPC projects of SEPC overseas project; review all preliminary designs and technical specifications.5. Support to prepare equipment maintenance instruction for GNPD (Philippines Dinginin Power Plant- 1,336 MW coal-fired power plant) EPC project. Show less
-
-
Maintenance Planning Chief
-
Oct 2015 - Jan 2018
Mabar Power Plant, Medan, IndonesiaCoal-fired 150MW*2 Unit (O&M)Oct 2015 - Jan 20181. Establish and operate the maintenance management system and warehouse management system of power plant.2. Support system supplier with maintenance and operation of data management system, development of warehouse management module.3. Supervise and control quality and safety of equipment site installation.4. Conduct inspection of power plant major equipment.5. Prepare and review standard maintenance instruction and operation guidelines.6. Prepare and review maintenance management, warehouse management procedure for power plant.7. Establish, execute and manage the training plan for Indonesia employees within the department. Show less
-
-
-
-
Electrical Engineer
-
Sep 2012 - May 2015
Coal-fired 660MW*2 Unit (O&M)1. Prepare, plan and execute the maintenance schedule of generator, ESP, HV, LV switchgear, etc. 2. Develop and execute annual equipment overhaul & small maintenance plans.3. Monitor and analyze steam turbine / generator and LV & MV motor vibration. 4. Develop procurement plan for electrical equipment and parts.5. Prepare project estimate, subcontracting and supervision.6. Be HSE officer to routinely carry out patrol and propose improvement plan.7. Plan and execute equipment and HSE improvement.8. Push and execute ISO 9000/14000 and NOSA system. Show less
-
-
Planning Maintenance Engineer
-
Sep 2009 - Aug 2012
Coal-fired 660MW*2 Unit (O&M)Sep 2009 - Aug 20121. Propose, plan, progress and track for power plant annual overhaul.2. Maintain and analyze the SAP system data base about defect reports and preventive maintenance.3. Maintain and analyze project vendor documentation, management vendor evaluation.4. Maintain and analyze project subcontracting documentation and files.5. Monitor and analyze major rotating equipment.6. Work on plant refurbishment and HSE improvement.7. Support project forecasting, subcontracting and supervising.8. Support to establish maintenance procedure and push management system execution.9. Push and implement ISO 9000/14000 and NOSA system. Show less
-
-
-
Taiwan Yes Deep Ocean Water Company
-
Hualien, Taiwan
-
IT Chief
-
May 2007 - Sep 2009
Beverage and Cosmetics Manufacturing 1. Establish, report and manage company ERP system. 2. Establish and push IT management system. 3. Review all department management procedures. 4. Plan and establish company’s network system. 5. Manage and maintain network and IT devices. 6. Push and implement ISO 9000/22000/HACCP system. Beverage and Cosmetics Manufacturing 1. Establish, report and manage company ERP system. 2. Establish and push IT management system. 3. Review all department management procedures. 4. Plan and establish company’s network system. 5. Manage and maintain network and IT devices. 6. Push and implement ISO 9000/22000/HACCP system.
-
-
-
Ho-Ping Power Company
-
Hualien, Taiwan
-
Planning Maintenance Engineer
-
May 2003 - May 2007
Coal-fired 660MW*2 Unit (O&M) 1. Propose, plan, progress and track for power plant annual overhaul. 2. Maintain and analyze the Q4 system data base about defect reports and preventive maintenance. 3. Maintain and analyze project vendor documentation, management vendor evaluation. 4. Maintain and analyze project subcontracting documentation and files. 5. Monitor and analyze major rotating equipment. 6. Work on plant refurbishment and HSE improvement. 7. Support project forecasting, subcontracting and supervising. 8. Support to establish maintenance procedure and push management system execution. 9. Push and implement ISO 9000/14000 and NOSA system. Show less
-
-
-
Taiwan Cement Corporation (Su Ao Factory)
-
Su Ao, Taiwan
-
C&I Engineer
-
Sep 1999 - May 2003
1. Plan and maintain whole plant instrumentation equipment and PLC system. 2. Plan and implement annual overhaul of equipment. 3. Plan and implement equipment improvement. 4. Support project forecasting, subcontracting and supervising. 5. Establishment and maintenance of whole plant network system. 6. Push and implement ISO 9000/14000 system. 1. Plan and maintain whole plant instrumentation equipment and PLC system. 2. Plan and implement annual overhaul of equipment. 3. Plan and implement equipment improvement. 4. Support project forecasting, subcontracting and supervising. 5. Establishment and maintenance of whole plant network system. 6. Push and implement ISO 9000/14000 system.
-
-
-
Acer
-
Taiwan
-
Computer Hardware Manufacturing
-
700 & Above Employee
-
System Testing Engineer
-
Jul 1999 - Sep 1999
1. Integration test of laptop Windows & NT Server operation system. 1. Integration test of laptop Windows & NT Server operation system.
-
-