احمد البيطار

Project Manager at Al Owaidah Eest. for Contracting
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saudi Arabia, SA
Languages
  • English Professional working proficiency
  • Arabic Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Construction
    • 1 - 100 Employee
    • Project Manager
      • Mar 2011 - Present

      I worked as an executive project manager in the region of Qassim for the following projects : 1 – The complementary actions for Qassim /Hail road ( the fifth group ) and it consists of : - Al Qaraa crossing and it's a crossing on Qassim / Hail road (Cast in site) Pre-stressed with ramps and the secondary road . - Al Buten crossing on Qassim / Hail road (pre-cast and pre-stress ) with ramps and the secondary road. - Al solaybiah crossing on Qassim /Hail road pre-cast and pre-stressed with ramps and the secondary roads . - Mohammad Al Ali Al swalim crossing with Al Madenah road at Al Bukairyah and Al Khabra and it's a pre-cast and pre-stressed crossing with ramps and the secondary road . - Agricultural link with Qaraen Al Turmus /National Guard. - Agricultural link / Al Qanarah Boulevard . 2 – The complementary actions for Qassim / Hail road ( crossing number 6 ) and it's a crossing for Qassim /Hail pre-cast and pre-stressed . 3 – The complementary actions for Qassim / Al Madenah road (the eighteenth group ) and it consists of : - Al Haysoniyah crossing on Qassim / Al Madenah road pre-cast and pre-stressed with ramps, the secondary road, and connecting the crossing with Al Haysoniyah village . - Al Dlemeyah crossing on Qassim / Al Madenah road pre-cast and pre-stressed with ramps and the secondary road . Show less

  • Al fawzani
    • Saudi Arabia
    • Project Manager
      • Mar 2008 - Feb 2011

      I worked as a project manager for Rafha and Hail Road and it consists of one sided road with the length of 47 Km containing 3 valley bridges and a camel crossing and a few pipe and box culvert. I worked as a project manager for Rafha and Hail Road and it consists of one sided road with the length of 47 Km containing 3 valley bridges and a camel crossing and a few pipe and box culvert.

    • Project Manager
      • Mar 2005 - Mar 2008

      I worked as a project manager for a sewage and pumping stations Southeast of Buraydah and it consists of sewage net made of Vitrified clay and fiber glass pipes with different diameters ranging between 150 mm and 1100 mm with the total length of 115 Km and seven pumping stations each one of them contains a wet well, a guard room, a generators room and an electricity converting center . I worked as a project manager for a sewage and pumping stations Southeast of Buraydah and it consists of sewage net made of Vitrified clay and fiber glass pipes with different diameters ranging between 150 mm and 1100 mm with the total length of 115 Km and seven pumping stations each one of them contains a wet well, a guard room, a generators room and an electricity converting center .

    • Architecture and Planning
    • 700 & Above Employee
    • Project Manager
      • Oct 2002 - Mar 2005

      Projects of networks and pumping stations and treatment stations in Qassim . At first I worked as a site engineer in Al Bukairyah's networks and treatment station and pumping station project and it includes : 1- Sewer network from 150 mm to 800 mm Vitrified clay pipe. 2- A pumping station that contains a wet well, a room for pumps, a room for generators, a guard room, an electricity converting center, and a pumping line . 3- Treatment stations for the Sedimentation lagoon system which contains : The entrance and Refineries facilities - Aeration lagoon - Sedimentation lagoon - Water chlorination - Chlorine building - Generators building - electricity converting center – guard room - Administrative building with three floors . and I was assigned in 2004/6/18 as a project manager on the following projects : 1 – The same previous project . 2 – Networks and pumping stations and treatment stations in Almethnab city and it's a smeller project to the one in Al Bukairyah and it only differs in the number of Sedimentation and Aeration lagoons . 3- The main lines with the pumping stations in Al Badae / Riyadh Al Khabra / Al Khabra / Assahben , and it consists of main swear lines with the diameter of 800 mm the fiber glass type and two pumping stations each one of them contains a wet well, a guard room, a generators room, an electricity converting center, and a pumping line. Show less

    • Project Manager
      • Jun 1999 - Oct 2002

      A company specializing in road works and I worked in it as a Project Manager for Hrd Albathaa St. with the length of 50 KM (Sub-contractor for Al khodiry company ) . Then I worked as a Project Manager for the following projects : 1- Camel Crosses– and Exit 13 / Almadinah road –Qassim . 2- The general location of the paper factory in The industrial city in Dammam . 3- Dumat Aljandal \​Mahjjah \​ Skaka road. 4- Dualize Rafhaa / ar'ar Road (seventh part) . A company specializing in road works and I worked in it as a Project Manager for Hrd Albathaa St. with the length of 50 KM (Sub-contractor for Al khodiry company ) . Then I worked as a Project Manager for the following projects : 1- Camel Crosses– and Exit 13 / Almadinah road –Qassim . 2- The general location of the paper factory in The industrial city in Dammam . 3- Dumat Aljandal \​Mahjjah \​ Skaka road. 4- Dualize Rafhaa / ar'ar Road (seventh part) .

    • Project Manager
      • Jun 1995 - Jun 1999

      Established an Execution office For projects and engineering consultancy and executed the following actions: * Works of study and supervision including : 1 - three private buildings 11 floors in Sllah Addin St. /Hamah – Syria . 2- Ice cream factory in Serehen . 3- Also a number of private residential buildings . * Execution works including : 1- Alfarook tower and it's a residential and commercial building consisting of ten floors and basement of two floors with finishing . 2- Water supply network of Albaath Neighborhood / Hamah – syria , and It consists of : - High Water tank with the capacity of 200 m3 and the height of 38.5 m . - Lifting pumps room . - Transmission and distribution lines and it's ductile pipes . - Secondary distribution lines and house connections and it's Galvanized Iron pipes. 3- The industrial Zone tank project in Hamah with the capacity of 200 m3 and height if 25 m with the pumps room and connection to the network list . Show less

    • Construction Supervisor
      • Mar 1987 - May 1995

      Worked at Hamah city hall for the office of licenses and construction. Worked at Hamah city hall for the office of licenses and construction.

Education

  • Uِِniversity of Aleppo
    Bachelor's degree, Civil Engineering
    1981 - 1986

Community

You need to have a working account to view this content. Click here to join now