user

NexTec System

Machinery Manufacturing
img No Team Available

Overview

We are using one of the worlds most advanced methods for laying ducts for fiber cables in streets and sidewalks. The method builds on the technology Microtrenching with diamond cutting blades. Behind this method is a brand new machine, alone in it's category, that instead of digging it is sawing through the asphalt or concrete surface layer and down into the underlying bearing layers. At the same time the machine places a large number of ducts on the bottom of the trench. Each of these ducts being dedicated for one of the homes passed. The installation capacity of the machine is between 300-600 meters per day. The method/ system can adopt to different environments and wishes! The system also provides design software, special developed fluid refilling material, GPR Scanning, especially developed asphalt and machinery to do it all fast and effective.

  • 16451, Southeast Orchard View Lane, Damascus, Clackamas County, Oregon, 97089, United States

    Get Direction