user

Crystal Petroleum FZE

Oil and Gas

View the employees at

Crystal Petroleum FZE
  • image
    Mary Bretany Escote Executive Secretary at Crystal Petroleum
    • United Arab Emirates
    • Rising Star
    View Details
  • image
    Ashfaq Mumtaz Terminal Operator at Crystal Petroleum FZE
    • Sharjah, Sharjah Emirate, United Arab Emirates
    • Rising Star
    View Details
  • image
    Iqbal Ali Security and weight bridge operator at Crystal Petroleum FZE
    • Al Hamriyah, Sharjah Emirate, United Arab Emirates
    • Rising Star
    View Details
  • image
    Naseer Khan Terminal Operator at Crystal Petroleum FZE
    • Sharjah Emirate, United Arab Emirates
    • Rising Star
    View Details
  • image
    Awais Riaz terminal security & weigh bridge operator
    • Sharjah, Sharjah Emirate, United Arab Emirates
    • Rising Star
    View Details

Overview

Crystal Petroleum FZE is an emerging independent storage facility for petroleum products located in Hamriyah, UAE. We own and operate 2 tank terminals in Hamriyah with a total capacity of 123,000 cbm. The facility has 27 nos dome roof tanks with varying capacities for flexibility in storage and blending of the petroleum products. Terminal has the facility to safely receive product by ship as well as road tankers thereby making optimum use of the terminal infrastructure. Our terminals relate to Hamriyah Port at the main as well as inner harbour by piggable dock lines which allows the client to plan vessels as per the draft restriction thereby having a reduced turnaround time in the Port. Facility is equipped with Automated Tank Gauging for continuous monitoring of the tank farm which is done through the Centralized Control Room. The terminals are operated as per the Standard Operating Procedures by a team of Operations personnel having experience of working with major Oil storage terminals. Our distinctive focus on both our clients & in providing unmatched service, coupled with a high degree of professionalism & creative logistical solutions that go way beyond traditional storage services, form the basis for an excellent partnership with our clients. Terminal Dock lines: 2 x 12” (CS lines from Main Harbour) 1 x 10” (SS line from Main Harbour) 1 x 10” (CS line from Inner Harbour) 1 x 8” (CS line from Inner Harbour) Terminal Tankage: 3 nos X 8900 cbm (Dome roof) 6 nos X 3000 cbm (Dome roof) 5 nos X 4675 cbm (Dome roof) 2 nos X 1000 cbm (Dome roof) 4 nos X 7580 cbm (Fixed roof) 7 nos X 2490 cbm (Fixed roof) Terminal receiving capacity: 1500 cbm/hr Terminal pumping capacity Centrifugal Pumps: 2 x 550 cbm/hr for ship loading Centrifugal Pump: 1 x 350 cbm/hr for ship loading Twin Screw Pump: 1 x 450 cbm/hr for ship loading Terminal Tank Truck Loading/Offloading Facility: Centrifugal Pumps: 3 x 150 cbm/hr Twin Screw Pump: 1 x 120 cbm/hr Screw Pump: 2 x 125 cbm/hr