Victor A. Barria

Country/Construction Manager - Micronesia at Amorient Engineering
  • Claim this Profile
Contact Information
Location
AR
Languages
  • Español Native or bilingual proficiency
  • English Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Jorge Daza

Muy buen manejo del proyecto!

Axel Uriel Somme

Trabajar con Victor fue realmente positivo, ya que su predisposición a solucionar nuestros problemas fue del 120%, atendiendo en todo momento a nuestros requerimientos y participando de forma activa en la solución de todos los problemas. Abierto a la discusión y demostrando una gran preparación. En un ambiente multicultural como el de la Ampliación del Canal de Panama, su actitud proactiva fue realmente de gran ayuda y sin esconderse en ningún momento.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Creating a BIM Execution Plan
    LinkedIn
    Sep, 2022
    - Sep, 2024
  • BIM-VDC for Construction
    LinkedIn
    Aug, 2022
    - Sep, 2024
  • Fundamentos de BIM: Roles, perfiles y procesos
    LinkedIn
    Aug, 2022
    - Sep, 2024
  • TOC PROJECT MANAGER PROFESSIONAL - TOCPMP
    Goldratt Consulting
    Feb, 2022
    - Sep, 2024
  • Cuarta revolución Industrial: Data science
    LinkedIn
    May, 2020
    - Sep, 2024
  • Project Online Profesional: Trucos
    LinkedIn
    Aug, 2019
    - Sep, 2024
  • Drone Professional Pilot - Unmanned Aircraft General - Small /(UAG)
    Federal Aviation Administration
    Nov, 2021
    - Sep, 2024

Experience

    • 1 - 100 Employee
    • Country/Construction Manager - Micronesia
      • Oct 2021 - Present

      Prior to finalization of Construction Contract, review the bid documents and prepare a Constructability Report. Shall assist the Government (GOV) with solicitation of Bidders to participate in the bidding, with receiving and analyzing bids received and making a recommendation to the (GOV) of award to a successful bidder, assist with review of the Construction Contract, shall have key team members attend a pre-award conference with the (GOV) and the selected Contractor. Schedule and conduct progress meetings on a weekly or as needed basis; review, analyze and approve construction schedules. Work closely with contractor to ensure that he takes action to mitigate delays and keeps the work on schedule. Respond to all questions relating to design and interpretation of design follow up for timely responses. Monitor status of contractor’s workforce, equipment status and material procurement. Review and approve shop drawings, material, and test samples, and requests for information submitted by contractor and recommend approval of contractor’s invoices, recommend owner action on any claims for additional cost or time extension. Witness all material tests carried out at site. Prepare scope of work and cost estimates of for potential change orders. Review contractor’s cost proposals and negotiate an agreeable cost for approval by the (GOV) and submit Monthly Progress Reports with emphasis on early warnings to avoid delays in execution. Monitor approval and receipt of all operations and maintenance manuals, as-built drawings, permits, affidavits. Prepare final inspection report according to the requirement of (GOV).The Construction Supervisory Staff shall secure and transmit to the (GOV) all keys, manuals, record drawings and maintenance stocks. Monitor approval and receipt of all operations and maintenance manuals, as-built drawings, permits, affidavits, and other required Contract Documents, and monitor receipt of Contractor and equipment supplier warranties and guarantees Show less

    • Automation Machinery Manufacturing
    • Consultancy & advisory services in Engineering & Desing / Project Management / Construction
      • Mar 2017 - Mar 2022

      Independent Consultant and Advisor in design engineering (conceptual, basic, extended basic and detail), support and/or development as regards the preparation of offers, project management with emphasis in planning, cost estimation, risk assessment, management of complaints and changes, quality management and construction. Expert consultant, advisor and reviewer of implementation plans, contracts, strategy and improvement of constructability and construction strategies, revision of processes and operation methods, maintenance, plans for the closure and dismantling of facilities. Implementation, development and improvement of risk plans for objective decision making. More than 20 years of experience working for the main national and international engineering and construction companies, including environmental, petroleum, oil & gas, infrastructure, tunnels (TBM), transportation, nuclear, ports, commercial and industrial buildings, water treatment and energy and power; plus a solid academic experience in several engineering fields. I have participated in important projects such as Panama Canal, Yacyretá Hydropower Dam, and other hydropower projects, as well as subways, refineries, airports, power nuclear plants and other facilities in Asia and Middle East. I have managed and/or developed portfolio projects of up to USD 5000 million in various geographical areas and cultures, under different contract strategies such as: EPC (Engineering, Procurement and Construction), EPCM (Engineering, Procurement management and Construction Management), Design - Build, Master Service Agreements, etc. Sound knowledge of project management according to Project Management Institute (PMI) philosophy and IPA Institute philosophy based on its implementation in various projects and companies. International experience: Bolivia, Colombia, Mexico, Panama, Morocco, Saudi Arabia, Singapore and USA. Show less

    • Argentina
    • Oil and Gas
    • 700 & Above Employee
    • Engineering Manager
      • May 2015 - Feb 2017

      Responsible to execute all CAPEX (Capital Expenditures) Projects and OPEX (Operating Expenses) Projects consistent with project objectives and company principles and ensure that the contractor’s execute design, procurement, construction and pre-commissioning activities are in accordance with the contract, engineering design and specifications and other exhibits. Responsible to monitor contractor organization plans, deliverables and construction packages to verify that required contractual cost, progress, quality, schedule and safety requirements are in compliance with performance expectations. Responsible to coordinate tie-ins and start-up with the operations organization, and to ensure that the project achieves established objectives in keeping with the approved Project Execution Plan and Company expectations, engineering procedures, and standards. Responsible to consolidate all engineering requirements of the refinery and execute them with its own or hired staff and in compliance with the use of best practices. Responsible for all engineering framework contracts of the Refinery. It participates in Project Internal Boards, Management of Change, Reliability Board, among others. Report to the Execute Broad / Director of the Refinery. Show less

    • Engineering Manager
      • Apr 2014 - Apr 2015

      I am an Engineering Manager with experience in delivering a wide variety of projects, from strategy through design, construction and operation. Experienced in rail, oil & gas, power and infrastructure. I currently manage all Project Units in the Design and Engineering business of Tepsi, leading a team of capable and skillful project professionals delivering Tepsi projects in the engineering environment. I am an Engineering Manager with experience in delivering a wide variety of projects, from strategy through design, construction and operation. Experienced in rail, oil & gas, power and infrastructure. I currently manage all Project Units in the Design and Engineering business of Tepsi, leading a team of capable and skillful project professionals delivering Tepsi projects in the engineering environment.

    • CIVIL & STRUCTURAL COORDINATOR
      • Apr 2011 - May 2014

      The Panama Canal Expansion Program broke ground in September of 2007, after overwhelming approval by a public referendum. The Program involves two new Post-Panamax lock complexes (Third Set of Locks), the deepening of the Pacific and Atlantic Canal entrances, the deepening of Culebra Cut, the widening and deepening of the Gatun Lake navigational channel and raising Lake Gatun to its maximum operational level. The design-build contract for implementation of the Third Set of Locks project was awarded by the Panama Canal Authority (ACP) to international consortium Grupo Unidos Por el Canal (GUPC) in July 2009. Providing support to GUPC for design joint venture, CICP Consultores Internacionales, LLC, in partnership with California-based MWH - TetraTech and Iv-Infra of the Netherlands. The $5.25 billion Expansion Program is scheduled to be completed in 2014 – coinciding with the 100-year anniversary of the opening of the original Canal. Main design aspect: • Lock walls: The cost-effective lock wall designs incorporate foundation drains that reduce the hydrostatic and hydrodynamic loads, enabling more efficient structures that achieve the performance goals for strength and durability. • Seismic design: Using state-of-the-art seismic analysis techniques, MWH is developing lock wall configurations that meet stringent seismic criteria at minimum cost. • Water consumption: Water saving basins – the largest in the world – are designed to reuse 60 percent of the fresh water consumed for lockages, with an optimized filling and emptying system that meets aggressive performance criteria for system efficiency and throughput. • Integrated operations and controls: Through optimum design of operational features and control systems, lock operations will be seamless and efficient. Through MWH’s innovative designs - lock operating gates for rapid opening and closing, an efficient filling and emptying system based on innovative hydraulic design. Show less

    • Project Manager
      • Jun 2013 - Mar 2014

      To develop the integrated project execution plan. To manage all project teams; to coordinate all specialty leaders; to establish priorities and assess the technical and economic progress of each project; to monitor each project according to its budget; to assess the performance of each team member; to assist the client in design, construction and logistic matters; to draft and review weekly reports to the client and the Company’s board of directs about the real vs planned performance; to develop and assess proposals; to manage financial indicators; to develop commercial and technical strategies according to the objectives of the Company. Show less

    • Zimbabwe
    • Advertising Services
    • 1 - 100 Employee
    • Civil & Structural Team Leader
      • Sep 2009 - Mar 2011

      Projects Project: Third Set of Locks for the Expansion of the Panama Canal. Panama. Project: Extension of Spillway Brazo Aña Cuá. Yaciretá. Binational Entity of Yacyreta. Projects Project: Third Set of Locks for the Expansion of the Panama Canal. Panama. Project: Extension of Spillway Brazo Aña Cuá. Yaciretá. Binational Entity of Yacyreta.

    • Belgium
    • Construction
    • 1 - 100 Employee
    • Civil & Structural Team Leader
      • 2007 - Aug 2009

      Projects Project: Hydropower project "Los Caracoles". Client Energia Provincial Sociead del Estado (EPSE). Dam located in the province of San Juan. Argentina. Project: Rabigh Refinery Expansion Project. Rabigh. Client Saudi Aramco-Sumitomo. Loacation Rabigh, Arabia Saudita. Projects Project: Hydropower project "Los Caracoles". Client Energia Provincial Sociead del Estado (EPSE). Dam located in the province of San Juan. Argentina. Project: Rabigh Refinery Expansion Project. Rabigh. Client Saudi Aramco-Sumitomo. Loacation Rabigh, Arabia Saudita.

    • Deputy Civil Manager of the Engineering Civil Department & Civil Team Leader for Projects
      • 2007 - 2009

      Projects Project: Refinery Ricardo Elicabe – Client Petrobras – Location Bahia Blanca, Argentina. Project: Jose de San Martin – Combined Cycle Power Plant. – Client Siemens and Construcciones Termicas – Location Santa Fe, Argentina. Project: POWER PLANT based in GAS TURBINES (3x100MW) Client O.N.E. (Office National d’Electricité). Location Mohammedia, Morocco. Projects Project: Refinery Ricardo Elicabe – Client Petrobras – Location Bahia Blanca, Argentina. Project: Jose de San Martin – Combined Cycle Power Plant. – Client Siemens and Construcciones Termicas – Location Santa Fe, Argentina. Project: POWER PLANT based in GAS TURBINES (3x100MW) Client O.N.E. (Office National d’Electricité). Location Mohammedia, Morocco.

    • United States
    • Civil Engineering
    • 100 - 200 Employee
    • Principal Civil Engineer
      • 2004 - Aug 2006

      Projects Project – Crystal (Expansion of Sucralose Inc) - Client Tate & Lyle – Location Jurong Island, Singapore. Project – Western Emulsion Plant. Refinery Expansion. Client Sherwin Williams. Location Fernley, Nevada. U.S. Toray Carbon Fiber Facility. INC. Refinery Expansion. Client Toray Industries. Location Decatur, Alabama, U.S. Project BB1-BB2. Interconnecting Header (Polyethylene Plants). Petrochemical Expansion Client Dow PBBPlisur... Polisur. Industrial Park. Location Bahía Blanca. Argentina Show less

    • Senior Civil & Structural Engineer
      • 2001 - 2002

      Projects Project: Extension of Refinery La Plata (Repsol YPF). ABB S.A. Project: Area Huantraico – Oil Field Trapiel. Neuquén. ABB S.A.-Chevron-Texaco. Project: Resolution 01 of 2003 of the Energy Secretariat. “ET Romang – Frame of 500 and 132 kV ”, Transener S.A. Bi-national project: Extension of High Voltage Line of 500 kV – Line Chocon Temuco. Transener S.A. Project: Extension of six electrical substations of Lines of 400 /115kV (Saltillo, Villa de García, Tepic, Guamuchil, Mazatlán, Pueblo Nuevo y Tepic). México, Techint S.A. de C.V. México. Show less

    • Senior Structural Engineer
      • 2000 - 2000

      Project: Extension of Line E of Buenos Aires City Subways. Project: Extension of Line E of Buenos Aires City Subways.

    • Civil / Structural Engieer
      • 1999 - 2000

      Project: International Airport El Calafate, Province of Santa Cruz. Architectural design: Architect Carlos Ott. Project: International Airport El Calafate, Province of Santa Cruz. Architectural design: Architect Carlos Ott.

    • Junior Structural Engineer
      • 1998 - 1999

      Projects: Draft Project of “Ciudad Judicial” (Judicial City). Bank Boston. Architectural Design, Architect Cesar Pelli. More than 20 residential and commercial buildings for different architecture firms of Buenos Aires City (Mario Roberto Alvarez and Assoc., Robirosa Beccar Varela Pasinato S.A., Solsona Salaberry Sanchez Gomez arch., etc.). Projects: Draft Project of “Ciudad Judicial” (Judicial City). Bank Boston. Architectural Design, Architect Cesar Pelli. More than 20 residential and commercial buildings for different architecture firms of Buenos Aires City (Mario Roberto Alvarez and Assoc., Robirosa Beccar Varela Pasinato S.A., Solsona Salaberry Sanchez Gomez arch., etc.).

Education

  • Universidad Nacional de La Plata
    Civil Engineer, Ingeniería civil
    1989 - 1996
  • Universidad Nacional de La Plata
    Building Engineer
    1989 - 1996

Community

You need to have a working account to view this content. Click here to join now