Land Surveyor
-
Sep 2021 - Jul 2022
Land Surveyor for Construction Mix Development Merdeka PNB118 Tower, Spire Tower (Facade). Completed construction of a 160m Spire Facade for Merdeka PNB 118 Tower. • Conduct all general surveys and alignment surveys at site (Facade alignment, Control level and positioning) • Maintain proper record and filing for survey records • Attend meetings with consultant and contractors • Plan, supervise and coordinate site work including of work schedule, procurement of materials and equipment • Ensure all work is carried out in accordance to the order requirements, drawings, and project time schedule • Update superior with project progress regularly Show less
-
-
-
-
Land Surveyor
-
Sep 2020 - Sep 2021
Project : East Coast Rail Line (ECRL) Project, Bentong. Scope of Work : Collect land survey data and build Temporary Benchmark (TBM) monument, Organized and conducted topographic surveys and levelling. Client : China Communication Construction (CCC) Sdn Bhd Project : KVMRT 2 (MRT Putrajaya Line)(Tunnel) Scope of Work : Conduct all general surveys and alignment surveys at site. • Setting out for works • Survey guidance systems • Reading and interpreting drawings • Calculations and data processing • Conducting as-built reports. Client : MMC Gamuda Show less
-
-
-
-
Land Surveyor
-
Apr 2018 - Mar 2020
Land Surveyor for Construction Mix Development Merdeka PNB118 Tower, Podium(Plot 6East),Basement & Carpark (5 Story)(Top-Down & Semi Top-Down Method). • Carry-out monthly monitoring for horizontal ground control by run the traverse and levelling from the datum reference. Established new control points if necessary to replace any destroyed control points. • Carry-out survey setting out work for project/site infra, earthworks, structural, architectural and MEP • Carry-out survey as-built work for project/site infra, earthworks, structural, architectural and MEP also pre and post constructions. • Carry-out Survey drafting works (CAD) for survey work sketch, field data processing, coordinate extraction and deviation calculations • To liaise and co-ordinate closely with site person in-charge, engineers and supervisors for immediate response to any discrepancies found in their on-going work at site. Show less
-
-
-
-
Land Surveyor
-
Nov 2017 - Mar 2018
Land Surveyor for Construction Mix Development Merdeka PNB118 Tower, Podium (Plot 6 East),Basement & Carpark (5 Story)(Top-Down & Semi Top-Down Method), and Water tank. • Conduct all general surveys and alignment surveys at site (Form slope, Retaining wall alignment, Control pipeline level) • Handle setting out work. • Maintain proper record and filing for survey records. • Attend meetings with consultant and contractors. • Plan, supervise and coordinate site work including of work schedule, procurement of materials and equipment. • Ensure all work is carried out in accordance to the order requirements, drawings, and project time schedule. • Update superior with project progress regularly. Show less
-
-
-
-
Assistant Surveyor
-
Jan 2017 - Feb 2017
⦁ Performed very detailed and accurate field surveys in compliance with all pilicies, laws, and procedures. ⦁ Organized and conducted topographic surveys to set boundaries. ⦁ Utilized various survey equipments and developed appropriate surface models. ⦁ Performed very detailed and accurate field surveys in compliance with all pilicies, laws, and procedures. ⦁ Organized and conducted topographic surveys to set boundaries. ⦁ Utilized various survey equipments and developed appropriate surface models.
-
-