Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Business Consulting and Services
    • 1 - 100 Employee
    • Senior Project Manager
      • Mar 2023 - Present
    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Senior Project Manager
      • Jul 2021 - Mar 2023
    • United Kingdom
    • Leisure, Travel & Tourism
    • 1 - 100 Employee
    • Site Controller
      • Oct 2010 - Mar 2023

      I am responsible for assisting with the setting up of a mobile crane, undertaking all kit and equipment checks prior to the commencement of every event, the setting up and positioning of all of the equipment on the ground, checking that every customer has gone through each check at each position prior to them reaching me, checking that the weight of each customer corresponds correctly with the chord that they have been assigned, checking that each harness has been attached to the correct standard, checking that all connection points have been completed correctly, safely dispatching each customer from a variety of heights (160ft, 300ft and 409ft) and making sure each customer has the best experience possible.

    • United Kingdom
    • Professional Training and Coaching
    • 1 - 100 Employee
    • Mental Health First Aider
      • May 2018 - Oct 2022
    • Assistant Project Manager
      • Apr 2018 - Mar 2019

    • Graduate Project Manager
      • May 2016 - Mar 2018

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Assistant Engineer
      • Jul 2015 - May 2016
    • Design Engineer Undergraduate Trainee
      • Jul 2013 - Jul 2014

      Throughout my 12 month, undergraduate, industrial placement I completed varied and wide range of tasks within the technical department. I was responsible for; the completion of technical layouts including all external works layouts, plot drainage layouts, Manhole schematic layouts and highway detail drawings. I also liased closely with the relevant parties to ensure that all of the required section agreement we're agreed upon prior to the commencement of construction work on site. I was also responsible for the creation of an F10 control sheet to ensure that the technical department could easily keep track of whether or not the HSE had been notified regarding all of the developments within the Lancashire region.

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Site Joiner
      • Sep 2008 - Sep 2010

Education

  • Sheffield Hallam University
    (BSc) Hons Construction Project Management, First Class Honours
    2012 - 2015
  • Sheffield Hallam University
    Higher National Diploma - Building Studies, Distinction
    2010 - 2012
  • The Oldham College
    NVQ Level 3 SIte Joinery
    2007 - 2010
  • The Oldham Sixth Form College
    A Levels and AS Levels, Psychology, Business, Media, Physical Education
    2005 - 2007
  • The Radlyffe school
    2000 - 2005

Community

You need to have a working account to view this content. Click here to join now