Richard Evans

Project Manager at ARB Midstream
  • Claim this Profile
Contact Information

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Project Manager
      • Apr 2019 - Present

      Project Manager responsible for the design and construction of oil gathering pipelines and related facilities in Colorado, Oklahoma and Texas. Current projects include the installation of approximately 120 miles of 12" and 16" pipelines in the DJ Basin Project Manager responsible for the design and construction of oil gathering pipelines and related facilities in Colorado, Oklahoma and Texas. Current projects include the installation of approximately 120 miles of 12" and 16" pipelines in the DJ Basin

    • Peru
    • Wholesale Import and Export
    • 1 - 100 Employee
    • Senior Oil and Gas Engineer / Project Manager (Contract Position)
      • Nov 2016 - Present

      Senior Consulting Engineer advising clients in the Oil and Gas Sector. Major projects include design services and team management associated with the construction of high pressure liquid petroleum pipeline systems for major US pipeline clients. Senior Consulting Engineer advising clients in the Oil and Gas Sector. Major projects include design services and team management associated with the construction of high pressure liquid petroleum pipeline systems for major US pipeline clients.

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Project Manager (Contract)
      • Sep 2017 - Mar 2019

      Project Manager for the Glass Mountain STACK extension project in Central Oklahoma. Project includes installation of a new 2150 HP oil terminal with 100,000 barrel oil storage and modifications to an existing oil terminal including installation of a 150,000 barrel storage tank. Also responsible for the installation of a 44 mile 16" pipeline to connect the new facilities to the existing Glass Mountain Pipeline. Project Manager for the Glass Mountain STACK extension project in Central Oklahoma. Project includes installation of a new 2150 HP oil terminal with 100,000 barrel oil storage and modifications to an existing oil terminal including installation of a 150,000 barrel storage tank. Also responsible for the installation of a 44 mile 16" pipeline to connect the new facilities to the existing Glass Mountain Pipeline.

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Engineering Advisor
      • Feb 2015 - Sep 2016

      Project Manager for the installation of pump stations, oil terminal facilities, API 650 tanks, truck offload facilities, wellhead LACTs, pipeline interconnect meter stations and oil gathering pipelines. Prepare authorizations for expenditure. Provide engineering support associated with the operational management of Medallion's Permian Basin oil gathering system. Project Manager for the installation of pump stations, oil terminal facilities, API 650 tanks, truck offload facilities, wellhead LACTs, pipeline interconnect meter stations and oil gathering pipelines. Prepare authorizations for expenditure. Provide engineering support associated with the operational management of Medallion's Permian Basin oil gathering system.

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Facilities Engineer
      • Dec 2012 - Jan 2015

      Design and manage construction of natural gas, oil and water pipelines, compressor stations,pump stations, and oil terminal facilities. Perform economic analysis of captal projects, prepare authorizations for expenditure. Engineering support and operational management of oil and gas gathering systems Design and manage construction of natural gas, oil and water pipelines, compressor stations,pump stations, and oil terminal facilities. Perform economic analysis of captal projects, prepare authorizations for expenditure. Engineering support and operational management of oil and gas gathering systems

    • France
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Senior Facilities Engineer
      • Sep 2005 - Jan 2013

      Manage construction of natural gas pipelines, compressor stations, treating processing facilities. Perform economic analysis of captial projects, prepare authorizations for expenditure. Engineering support and operational management of gas gatheirng systems Manage construction of natural gas pipelines, compressor stations, treating processing facilities. Perform economic analysis of captial projects, prepare authorizations for expenditure. Engineering support and operational management of gas gatheirng systems

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Senior Engineer
      • Nov 2000 - Sep 2005

      Responsible for engineering and project management activities associated with DCP's Eastern Oklahoma asset. Later became responsible for DCP's Northern Colorado asset consisting of several thousand miles of pipe and seven processing plants. Coordinate Process Safety Management activities associated with asset operation. Responsible for DOT compliance and managing environmental permitting activities associated with asset operation. Responsible for engineering and design of new facilities. Produced cost estimates and assisted in economic analysis of projects.

    • United States
    • Real Estate
    • Project Manager
      • Nov 1999 - Oct 2000
    • United States
    • Construction
    • 400 - 500 Employee
    • Project Engineer/ Engineering Manager
      • Mar 1991 - Oct 1999
    • Project Developement Engineer
      • Jun 1989 - Mar 1991
    • Manager, Operations and Construction
      • Dec 1984 - Feb 1989
    • United States
    • 1 - 100 Employee
    • Engineer I Engineer II
      • Aug 1981 - Dec 1984

Education

  • University of Oklahoma
    BSME, Mechanical Engineering
    1976 - 1981

Community

You need to have a working account to view this content. Click here to join now