Reece Davis
Pipefitter at Astan Renewable Energy Ltd (Astan Pipework & Plumbing)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
NVQ Level 3 Diploma in Installing Engineering Construction Plant and Systems - Pipefitting
ECITBDec, 2017- Sep, 2024 -
NVQ Level 2 In supporting engineering construction activities - Pipefitting
ECITBOct, 2015- Sep, 2024 -
NVQ Level 2 Plumbing and Heating
Peterborough Regional CollegeJun, 2014- Sep, 2024 -
UK Driving Licence Cat B
Driver and Vehicle Licensing Agency (DVLA)Jul, 2013- Sep, 2024 -
SSSTS
ECITBJan, 2020- Sep, 2024 -
Slinger/signaller
CITBNov, 2019- Sep, 2024 -
Mobile Scaffold Tower build and use
PASMASep, 2019- Sep, 2024 -
ECITB CCNSG Safety Passport
ECITBMar, 2021- Sep, 2024 -
Ace Level 3 Gold Pipefitting Skills CSCS Card
ECITBFeb, 2021- Sep, 2024 -
IPAF 3B
International Powered Access Federation (IPAF)Jul, 2018- Sep, 2024 -
JIB GOLD Mechanical Pipefitter CSCS Card
CITBMay, 2018- Sep, 2024 -
Irish SafePass
-Aug, 2018- Sep, 2024 -
Fire safety awareness
High Speed Training LtdJan, 2020- Sep, 2024 -
Confined space
High Speed Training LtdSep, 2019- Sep, 2024 -
Face fit RPE
Face Fit Testing UKAug, 2019- Sep, 2024
Experience
-
-
Pipefitter
-
May 2019 - Present
Waste to energy power plants, water treatment works, various HMP prisons, RAF and MOD bases, quarrys, and factories. Hull energy works Levenseat renewable energy, Forth Scotland Ince bio power, Chester SITA suez transfer station, Shepperton Welland power station, Leicestershire Cobalt energy incinerator Stoke. Cobalt energy incinerator Malvern JV Advance Windermere WWTW Leeds/knosthrop waste water treatment Yorkshire water FP McCann Ely Tyseley Birmingham Bio Power Wednesbury Sustainable Energy Centre Various MOD and RAF bases Various HMP prisons Various Factories Fabrication and Installation of a Range of pipework jobs including ; welded, screwed, crimped, compression mainly swagelok, fusion welded, solvent cemented, victaulic, soldered, and Viking Johnson mechanical jointing, varying from 6mm up to 36”. Materials including; Ductile, stainless, carbon, exotic metals; Inconel, Chrome. Plastics; PE, PVC, ABS. Copper. Work on Gas, steam, water, and chemical pipework systems. I have worked on various shutdowns and maintenance projects for Astan. Following safety standards of the company and clients sites. Show less
-
-
-
Doosan Babcock
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Pipefitter
-
Apr 2019 - May 2019
Grangemouth TAR shutdown Grangemouth TAR shutdown
-
-
-
Bilfinger UK
-
United Kingdom
-
Engineering Services
-
700 & Above Employee
-
Pipefitter
-
Apr 2019 - Apr 2019
BP saltend turnaround BP saltend turnaround
-
-
-
JD Plant Pipework
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Pipefitter
-
Feb 2019 - Apr 2019
New build school project, heating mains and piping up radiators with threaded low carbon steel. New build school project, heating mains and piping up radiators with threaded low carbon steel.
-
-
-
INTOHEAT Ltd
-
United Kingdom
-
Facilities Services
-
1 - 100 Employee
-
Pipefitter
-
Jan 2019 - Feb 2019
Fabrication and Installation of carbon Steel pipe work and supports on University accommodation project. Fabrication and Installation of carbon Steel pipe work and supports on University accommodation project.
-
-
-
Jones Engineering Group
-
United Kingdom
-
Retail Office Equipment
-
High Purity Pipefitter
-
Aug 2018 - Jan 2019
High Purity Pipefitting, thin wall bio bore and schedule stainless and carbon steel pipework. BioCork2 Johnson & Johnson project High Purity Pipefitting, thin wall bio bore and schedule stainless and carbon steel pipework. BioCork2 Johnson & Johnson project
-
-
-
NG Bailey
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Pipefitter
-
Jun 2018 - Jul 2018
Installation of carbon steel pipe work, screwed, welded, cast iron Fabrication of Pipe clips and supports and installation. Installation of carbon steel pipe work, screwed, welded, cast iron Fabrication of Pipe clips and supports and installation.
-
-
-
-
Pipefitter
-
Aug 2014 - Jun 2018
Time served apprenticeship 2014 - 2017 Various shutdowns, outages, project and maintenance works. Tipton, Doosan babcock Slough Heat and Power station Didcot B power station Pembroke power station Little barford power station Uskmouth power station Aberthaw power station GSK worthing pharmaceutical plant Grangemouth oil refinery DSM Dalry pharmaceutical plant Time served apprenticeship 2014 - 2017 Various shutdowns, outages, project and maintenance works. Tipton, Doosan babcock Slough Heat and Power station Didcot B power station Pembroke power station Little barford power station Uskmouth power station Aberthaw power station GSK worthing pharmaceutical plant Grangemouth oil refinery DSM Dalry pharmaceutical plant
-
-
Education
-
Hampton College
GCSE, Various -
Peterborough Regional College
NVQ Level 2, Plumbing and Heating -
Selby College
Advanced NVQ Lvl 3, Pipefitting