Rajiv Jindal
Project consultant (knitting and Garmenting) at Shyam Indospin Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Hindi Native or bilingual proficiency
-
Punjabi Limited working proficiency
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
SGI Buddhism Practitioner
Sokka Gakkai International, JapanNov, 2013- Sep, 2024
Experience
-
-
Project consultant (knitting and Garmenting)
-
Aug 2017 - Present
-
-
-
DRAGON SWEATER BANGLADESH LTD
-
Bangladesh
-
Retail Apparel and Fashion
-
1 - 100 Employee
-
Director PPC and QC
-
Nov 2016 - Apr 2017
-
-
-
KANODIA INTERNATIONAL PRIVATE LIMITED
-
India
-
Textile Manufacturing
-
1 - 100 Employee
-
GM Production
-
May 2014 - Nov 2016
• Manufacturing of home furnishing products having Flat knitted throws, cushion covers, baby blankets, stockings etc. 100% export in all over world around more than 60 clients. • Manufacturing of home furnishing products having Flat knitted throws, cushion covers, baby blankets, stockings etc. 100% export in all over world around more than 60 clients.
-
-
-
-
Head-Operations
-
Nov 2010 - Feb 2014
• Flat Knit garments (Sweaters) knitting in exclusive yarns such as Cashmere, Merino Wool, Silk blends for highly quality oriented buyers like Ciocca Inc, Cashmere Products Group, Fibertex and other European buyer. • Looking Manpower management, Production, Quality, pre-production Sampling, store, Raw-material planning, out-side job orders, interaction in costing, contractual billing, merchandising and QC related issues on daily basis. • Made complete plant layout considering all method/operation flow of garment engineering of international standard.
-
-
-
-
GM - Production
-
Nov 2006 - Aug 2010
• Interaction with Clients for Flat Knit garments(Sweaters) in domestic like USI, Pantaloon, Color-Plus and in international market like Ekyog, Cage Creek, Ethos, Eastern Warmth (for Organic cotton which are in huge demand in Europe), for new developments and production orders. • Looking Production, Quality, pre-production Sampling, store, Raw-material planning, out-side job orders, interaction in costing, contractual billing, merchandising and QC related issues on daily basis. • Made complete plant layout considering all method/operation flow of garment engineering of international standard. • Procured state of art m/c equipments of best international standard related with Knitting, Assembly, Washing, Finishing and Quality Procedures. • Major role in the end product by handling more than 200 m/c in-house and outside job work man power for costing, planning, knitting and CMT. • Reduced the extra manpower on different levels and recruited the cost effective team as per company’s policy • Introduced the Training sessions for skilled, semi skilled & fresher to develop their skills at different machines and quality process. • Improved productivity by 60% to 80% through Time & operational study, Industrial Engg of styles. Achieved 99% record timely shipment of orders with quality.
-
-
-
Winsome Group
-
India
-
Real Estate
-
Production Head
-
Dec 2005 - Oct 2006
and Responsibilities: Worked in a professional and fully computerized manufacturing set up Interaction with Customers for orders and inspections like H&M, MG, TATA-Ascots, ITC, Benetton Handling more than 150 m/c / man power for CMT and finishing independently Co-ordination with all departments for target oriented completion of the shipments Planning of materials and man power for all stages of order to achieve the deadline of shipments Handling all the commercial matters for the project Analyzing and sorting out the technical problems during process Preparing material requirement plan for the sourcing department Daily reporting to unit head about production details
-
-
-
-
Production Manager (Acting DGM)
-
Jan 2005 - Oct 2005
Role and Responsibilities: Interaction with Customers for orders and inspections for product - breeches, rugs Handling more than 120 m/c / man power for CMT and finishing independently Initiated purchase of materials from Chinese suppliers to save costs and source right material. Did market scanning, set up the contacts and visited their manufacturing facilities in China before the shipment Identification and analysis of gaps to reduce errors and increase efficiencies Planning and process co-ordination to ensure timely shipment Post Implementation support to customers through various communication channels Reporting to GM and monthly meeting with MD of the Group.
-
-
-
SPL Industries Limited
-
India
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Manager (Production Planning & Industrial Engg.)
-
Jun 2001 - Dec 2004
• Interaction with merchants and QC persons for daily update planning and inspections from Buying House like GAP, Triburg, Colby, H&M and OTTO for product - Sweaters. • Designed complete plant layout considering all method/operation flow of garment engineering according to international standard. • Line balancing of all the process stations by integrating sequence to optimize the qualitative output in the specified time frame to meet out customer commitment. • Identification and Analysis of the technical issues and gaps during production and make the issue meeting to sort out at different stages to get the final quality product. • Done production costing and handles all contractual costing for all processes of styles before start bulk. • Done SAP PPC training to implement the optimum production strategies at floor to control the break downs and wastage of material and accessories at assembly level. Defining storage locations according to the customer requirements. • Initiated Planning and Industrial Engineering department with motivation of GAP Inc merchandizing head. Increased the work efficiency 10% more with decreasing production cost up to 15%. • Upgraded existing system to get the transparent and quick update reports and to get the updated inventory records. Achievement: • Promoted as a Manager (PP & IE) from Knitting (Trainee) with in the span of two and half years. Achieved consistent performance in all areas like Knitting (computer and hand flats), assembly and finishing & packing.
-
-
Education
-
Punjab Engineering College
M.E., Product Design and Technology -
Amravati University
B.E, Electronics and Comm