RAJ KUMAR
Deputy Project Manager at SHANKARANARAYANA CONSTRUCTIONS PRIVATE LIMITED- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
SHANKARANARAYANA CONSTRUCTIONS PRIVATE LIMITED
-
India
-
Construction
-
100 - 200 Employee
-
Deputy Project Manager
-
Jun 2022 - Present
-
-
Deputy Project Manager
-
Jun 2022 - Oct 2023
Working as Casting yard in-charge for Pre casting elements as below,A - Viaduct Works.1. Pre tension U Girders.2. Post tension I Girders.3. Concentric, Eccentric, Stepped Pier caps.4. Portal Beams.5. Parapets..B. Stations:- 1. Post tensioned Pier arms.2. Pre tensioned I Girders,3. RCC Beams.C. Fabrication of Composite I Girders
-
-
-
Dilip Buildcon Ltd.
-
India
-
Construction
-
700 & Above Employee
-
Assistant Construction Manager
-
Jun 2020 - May 2022
Worked as Casting yard in-charge for Post and Pre tensioned I Girders, Precast Segmental Box Girder by Short line Method, RE Panels and Segment Erection including Crash barrier, Expansion joint works. Worked as Casting yard in-charge for Post and Pre tensioned I Girders, Precast Segmental Box Girder by Short line Method, RE Panels and Segment Erection including Crash barrier, Expansion joint works.
-
-
-
URC Pvt Ltd
-
India
-
IT Services and IT Consulting
-
1 - 100 Employee
-
Deputy manager (Civil)
-
Mar 2019 - May 2020
Worked as Section In-charge of Elevated Viaduct works Pile, Pile cap, Pier with Pier cap for Road cum Rail Project. Worked as Section In-charge of Elevated Viaduct works Pile, Pile cap, Pier with Pier cap for Road cum Rail Project.
-
-
-
NCC Limited
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Senior Engineer
-
May 2016 - Feb 2019
Worked in Pre-casting yard for Precast Segmental box Girder by Long line Method. Post tension and Pre tension I Girders, Parapets etc. Worked in Pre-casting yard for Precast Segmental box Girder by Long line Method. Post tension and Pre tension I Girders, Parapets etc.
-
-
-
Gammon India Ltd
-
India
-
Construction
-
700 & Above Employee
-
Site Engineer
-
Jan 2008 - Apr 2016
Worked in Two Projects. 1. Underground Metro Project;- Guide wall, Diaphragm wall, Entry Exits work and Concourse, Roof Slab work, Utilities diversion etc. 2. Elevated Highway Project:- Pre-casting work like Segmental box Girder by Short line method Worked in Two Projects. 1. Underground Metro Project;- Guide wall, Diaphragm wall, Entry Exits work and Concourse, Roof Slab work, Utilities diversion etc. 2. Elevated Highway Project:- Pre-casting work like Segmental box Girder by Short line method
-
-
-
-
Site Engineer
-
Apr 2007 - Dec 2007
Building Works Building Works
-
-
Education
-
C.S.I. Polytechnic College
Diploma of Education, Civil Engineering