Racha Rachwan , LEED AP BD C, AVS

Design Management Director at ACE Project Management Moharram Bakhoum
  • Claim this Profile
Contact Information
Location
Egypt, EG
Languages
  • French Professional working proficiency
  • English Professional working proficiency
  • Arabe Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Egypt
    • Design Services
    • 100 - 200 Employee
    • Design Management Director
      • Jan 2020 - Present
    • Egypt
    • Oil and Gas
    • 1 - 100 Employee
    • Director | Project Management Department
      • Aug 2019 - Present
    • United Arab Emirates
    • Retail
    • 700 & Above Employee
    • Design Manager
      • Oct 2015 - Jan 2020
    • United States
    • Construction
    • LEED Consultant
      • Dec 2012 - Oct 2015

      Assist the design, construction team and owner in attaining LEED certificationAdminister, review and verify all documentation and submittals to the USGBCEstablish a regular communication channel with all project team members required to participate to assure the implementation of agreed LEED credits. Provide action items/agreement notes as per LEED score cardProvide point tracking in all project phases. Provide the owner with updated LEED scorecard at a minimum of every two months and/or every time the scorecard changes. Note thestatus of pertinent tasks, assignments and deadlines in each update Show less

    • Head of Design Management Department
      • Jan 2013 - Mar 2014

      1- Manage all consultants and design activities in all projects.2- Ensure that consultant are on-track concerning design schedules.3- Gather different design disciplines documents (design, specifications & BOQ) to prepare Tender Documents for different packages.4- Liaise with site staff (design coordinator) to Ensure that all contractors received latest construction drawings.5- Coordinate between Core team and site to finalize any design issue / missing designs.

    • Design Manager
      • Dec 2010 - Dec 2012

      CityStars Sharm El SheikhPorto Matrouh

    • Head of Variation Orders Deparmtent
      • Nov 2009 - Nov 2010

      - Responsible for the variation orders requested by the clients, calculations for the quotations of the variations, delivering the drawings to the site and pursuing the construction process.- Responsible to make the design and the calculations for the swimming pools following the clients requirements delivering the drawings to the site and pursuing the construction process.

    • head of working drawings team
      • Aug 2007 - Oct 2009

      Responsible to issue the units working drawings and coordinate it with the structure drawings. Submit the full package to the construction site and follow up with the construction team.

    • Business Consulting and Services
    • 1 - 100 Employee
    • Senior Architect
      • Aug 2003 - Jul 2007

      Head of a team. Responsible to issue designs and presentation reports then to submit design development and working drawings for numerous projects.- Hospital of Mansheyet Nasser - 150 bed - funded by the Emirates Funds Box. (Working Drawing).- The University of Sanaa – Faculty of Sciences (avant projet, preliminary &working drawings).- The University of Sanaa – Faculty of Pharmacy (avant projet, preliminary drawings & Team Leader for the Working drawings).- Abu Zaabal Steel Mill Company Factory (Working Drawings & Details):- The Arab Bank – Alexandria branch (Working Drawing).- The Ahly Bank – Sohag branch (Design Alternative & Working Drawing).- The Ahly Bank – Menya branch (Participation in the Design & Working Drawing).- The NSGB Bank – Manyal branch (Design & Working Drawing).- The NSGB Bank – Hurghada branch (Design & Working Drawing).- The NSGB Bank – Ismailya Main branch (Design & Working Drawing). Show less

    • Architect
      • Aug 2000 - Jul 2003

      Responsible for the design development and working drawings- Steignberger Dahab Resort (4 Stars Hotel) (Design & Interior Work & working drawing):- A touristic village – Sharm El Sheikh (avant projet, preliminary & working drawings).- Administration building as an annexe for the new stores for The Eastern Company and the service building. (Working Drawing).- The administration building for the 81 Factory (Avant projet).- The design and the integrated working drawing for the canteen building for the Egyptian Cement Company.- Electrical substation linked to the new runway of the Cairo Airport. (Working Drawing).- The Egyptian Company for Fertilizers – Suez (Interior and Working Drawings for VIP Restaurant)- The administrative and factory building of the Steel Mass Factory (Working Drawings).- Extension for the steeping & cleaning building for the National Company For the Maize Products. (Working Drawings – Steel structure).- Extension for the extension of building 6 for the National Company For the Maize Products (Design & Working Drawings – Steel structure).- The Compressor building for the National Company For the Maize Products (Working Drawings).- The conference center for the 200 Factory (Preliminary Drawings).- The development of Ageeba – at Marsa Matrouh city (Preliminary Drawing & Presentation).- The technical proposal for the development of the old Imbaba Airport. (Technical Proposal).- The technical proposal for the annexe of the Mattareya Educational Hospital. (Technical Proposal).- The technical proposal for for a school in Benin. (Technical Proposal).- The technical proposal for the social club of The Military Production Organization at Helwan.- The technical proposal for the feasibility & detailed design studies for selected small infrastructures, urban development and asset rehabilitation/ revitalization projects in Aden.- The technical proposal for development opportunities in Yanbo’ City in KSA, residential, commercial, gas station. Show less

Education

  • USGBC
    LEED AP BD+C, Accrediated Professional in Building Design and Construction
    2011 - 2012
  • SAVE International
    AVS, Value Engineering
    2011 - 2011
  • Ain Shams University
    Master of Architecture (M.Arch.), Environmental Design
    2002 - 2008
  • Ain Shams University
    Bachelor of Applied Science (B.A.Sc.), Architecture
    1995 - 2000
  • Notre Dame Des Apôtres
    1981 - 1995

Community