Nicolás Strauss

Management at Plastar Group
  • Claim this Profile
Contact Information
Location
Argentina, AR
Languages
  • Español Native or bilingual proficiency
  • Inglés Native or bilingual proficiency
  • Portugués Professional working proficiency
  • Sueco Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Argentina
    • Plastics Manufacturing
    • 1 - 100 Employee
    • Management
      • Oct 2022 - Present
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Drilling Engineer
      • Feb 2021 - Oct 2022

      Senior Drilling Engineer representing Bandurria Sur Investments (BSI), partnership between Shell and Equinor, in a Joint Venture with YPF with the objective of developing an Unconventional field in the Neuquen Vaca Muerta Basin.

    • Lead Drilling Supervisor
      • Nov 2018 - Feb 2021

    • Drilling Supervisor
      • Aug 2016 - Nov 2018

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Well Engineer II - Integrated Drilling Services (IDS)
      • Nov 2015 - Aug 2016

      Engineer in charge of a 2000 HP rig drilling HPHT gas wells for Saudi Aramco on the Ghawar Gas Field Project.

    • Well Engineer II - Integrated Drilling Services (IDS)
      • Aug 2015 - Oct 2015

      Part of a team managing a 1500HP rig drilling horizontal exploratory wells for Shell on the Vaca Muerta Shale Play in Neuquen, Argentina.

    • Well Engineer 1 - IPM WCI
      • Sep 2014 - Aug 2015

      Part of a team managing a 1500HP rig drilling horizontal exploratory wells for Shell on the Vaca Muerta Shale Play in Neuquen, Argentina.

    • IPM Well Engineer Trainee
      • Aug 2013 - Sep 2014

      - Shell Neuquén Unconventional Shale Project. Drilling horizontal exploratory wells for Shell in the Neuquén basin, Argentina. AWSS.- International Assignment in West Venezuela, Offshore Maracaibo Lake. Rig: AJS-101. September 2013 / January 2014

    • China
    • Software Development
    • 1 - 100 Employee
    • Evaluations Engineer
      • Jan 2013 - Aug 2013

      • PDM and drilling tools field operator • Engineering support and drilling optimization • Distribution of equipment and tools • PDM and drilling tools field operator • Engineering support and drilling optimization • Distribution of equipment and tools

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Intern with the Asset Development Team
      • Nov 2011 - Jan 2013

      Main activities: • Design and construction of equipment and surface facilities • Procurement of equipment and materials • Participation in projects: Puesto Flores field development, Puesto Flores Battery construction and start-up, Puesto Flores Temporary Facilities, Puesto Flores-Loma Negra Pipeline, Implementation of the metric Energy Intensity at El Trapial field, Surface Facilities for developing Vaca Muerta Shale Main activities: • Design and construction of equipment and surface facilities • Procurement of equipment and materials • Participation in projects: Puesto Flores field development, Puesto Flores Battery construction and start-up, Puesto Flores Temporary Facilities, Puesto Flores-Loma Negra Pipeline, Implementation of the metric Energy Intensity at El Trapial field, Surface Facilities for developing Vaca Muerta Shale

    • Section Manager: Energy, Science and Technology
      • Aug 2010 - Aug 2012

Education

  • Instituto Tecnológico de Buenos Aires / ITBA
    Petroleum Engineer, Petroleum Engineering
    2007 - 2012

Community

You need to have a working account to view this content. Click here to join now