Mohammad Hatami

Project Manager at Omran Sazan Mahab (O.S.M. Co)
  • Claim this Profile
Contact Information
Location
Tehran, Tehran Province, Iran, IR
Languages
  • English Professional working proficiency
  • Kurdish Native or bilingual proficiency
  • Persion Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Workshop of pumps & compressors
    -
    Apr, 2019
    - Sep, 2024
  • 1- Inclinometer Inspection System (Daelim of korea)
    -
  • CMMS certificate
    -
  • ICDL 1 & 2 certificate ( Computer skills )
    -
  • Piping inspection certificate
    -
  • Preventive Maintenance ( PM ) certificate
    -
  • Welding inspection MT for ASNT level 2
    -
  • Welding inspection PT for ASNT level 2
    -
  • Welding inspection RTI for ASNT level 2
    -
  • Welding inspection UT for ASNT level 2
    -
  • Welding inspection VT for ASNT level 2
    -
  • Workshop of ISO 9001-2015
    -

Experience

    • Iran
    • Environmental Services
    • 1 - 100 Employee
    • Project Manager
      • Jun 2021 - Present

      Design, purchase and construction of a sanitary and industrial wastewater plant with a capacity of about 22000 cubic meters per day Design, purchase and construction of a sanitary and industrial wastewater plant with a capacity of about 22000 cubic meters per day

    • Mechanical & equipment supervisor
      • Feb 2020 - Present

      Western tehran wastewater treatment plant Western tehran wastewater treatment plant

    • Iran
    • Mechanical Or Industrial Engineering
    • 1 - 100 Employee
    • Project Manager
      • Apr 2019 - Feb 2020
    • Iran
    • Glass, Ceramics and Concrete Manufacturing
    • 1 - 100 Employee
    • Senior mechanical engineer and maintenance planner
      • Jan 2018 - Apr 2019

      1) Conduct and design maintenance method and strategy 2) Planning for PVM & EM for increasing the availability of equipment and preventing of new purchases 3) Determine spare parts technical information (Part catalog) for guiding procurement team 4) Preparing PM plane schedule according to instruction mentioned in equipment manuals 5) Leadership of mechanical & electrical TPM in company 6) Preparing the spare part list with priorities to domestic & foreign purchasing order 7) Preparing trouble shooting procedure for most repeated repair work with benefit remedy 8) Participate in all meeting with other produces part and daily Fast Response (FR) meeting 9) Participate in internal and external audit and response to issued NCRs 10) Participate in installation of new equipment’s 11) Responsible to any breakdowns and EM & PM tasks 12) Preparing PM check list & procedures in two level operation & technical 13) Preparing the technical drawings for components 14) Preparing the cost of yearly maintenance work 15) Determine corrective action and action plane to more repeated faults 16) Establish the CMMS (computerized maintenance management system) for company to follow the TPM scopes 17) Meeting with foreign supplier for troubles shooting and new equipment purchasing 18) Managing all repair works in compressors, blowers, furnace, compacting CNC, cranes, lift trucks, conveyors and etc. 19) Preparing the lesson learns for all new mounting and new repair works 20) Preparing the all part catalog of components for guiding the technical purchasing group 21) Preparing the equipment identity for all produces equipment 22) Design and managing the work flow for maintenance 23) Determine the KPI & stop rate of equipment Show less

    • Maintenance & Technical manager
      • Dec 2014 - Jan 2018

      Tehran Waste Water treatment project Rey city, Iran Maintenance & CMMS manager 1) Following the preemptive maintenance (PM) according the equipment vendor recommendations 2) Arranging the mechanical and electrical staffs to rectifying the event maintenance 3) Investigation of project equipment drawings to establish the proper method for being in more progress all parts 4) Participating in consultant and client weekly meeting 5) Maintenance the static & rotary equipment include variety of pumps , gearbox, co-generator, blowers and gas storage tanks with relevant piping 6) Managing the all relevant inspections of equipment 7) Preparing the proper report to client and consultant by CMMS software 8) Managing the computerize maintenance management system (CMMS) of project 9) Updating all preemptive maintenance in SAMA software according the operation and maintenance manuals (O & M) and inspection of performance 10) Deeply involved in CMMS implementation and data gathering process including equipment data, PM task, spare part with other discipline support 11) Creation of the Maintenance database (Tag & equipment) 12) Combine Planned Preventive Maintenance (PPM) Program and Procedures to each equipment 13) Maintain and review equipment hierarchy, critical rating and technical files in Computer Maintenance Management System (CMMS) 14) Keep update and clean data base tables: equipment, PM task, Backlog work request, etc 15) Regular Interaction with system users, support and training 16) Analyze Key Performance Indicators and trends to identify improvement opportunities. 17) Issue the domestic and foreign purchasing order for mechanical and electrical spare parts 18) Keep connect & set regular meeting with foreign vendor & supplier 19) Managing the preservation activity of all equipment Show less

    • Welding Inspection & QA/QC manager
      • Nov 2011 - Dec 2014

      1)Responsible to ensure that necessary strategies of project construction and controls are demonstrably in place to assure the construction integrity 2)Inspection of all steps of building storage tanks and piping according with project documentation (ITP, Procedure, Drawings, FIN, FIR, NCR, Audit…) & welding process tests as VT, PT, PAMI, RT, UT, 3)Review project processes and procedures have been implemented to demonstrate full compliance with the governmental integrity related laws 4)Review and ensure that the facilities under development, designed and built by EPC Contractors are managed in such a way that integrity maintained during the full construction phases 5)Ensure that the Project teams have made adequate integrity assumptions in the development of the basis of project design, operational strategies. 6)Provide guidance in the development of Integrity Assurance processes and procedures of related projects as required 7)Assisting the QA/QC Manager by acting as QS auditor (the audit leader will preferably be assigned to audits of his own technical expertise) 8)Contributing to the assurance that the facilities under development by the EPC Contractor are designed and built in such a way that integrity (and hence safety and economic performance) can be maintained during all phases. 9)Managing external resources in the execution of audits 10)Coordinating with other auditing teams to prevent unnecessary disturbance of running projects 11)Review of EPC Contractor QA manual control and supervision of all amendments and revisions 12)Control and the distribution of Company approved quality documentation 13)Monitor quality related activities on the project and prepare weekly QA/QC Report. 14)Attend quality management meetings performed by EPC Contractor 15)Monitor the disposition of all issued nonconformance reports. 16)Monitor the progress and effectiveness of the project quality management system. Recommend and implement improvements when required. Show less

    • Mechanic Engineer & QA/QC Engineer & Piping Supervisor
      • Jan 2010 - Nov 2011

      1) Control of pump and motors 2) Check up regularly the water line 3) Control quality of new equipment 4) Installation of pipe line and control the quality matters for piping(VT,PT & RT) 5) Issue the quality documentation 6) Clarify the welding processes after pass the inspection testes 7) Surveillance for maintenance of water line equipment 8) Control the calibration of equipments and its certificate 1) Control of pump and motors 2) Check up regularly the water line 3) Control quality of new equipment 4) Installation of pipe line and control the quality matters for piping(VT,PT & RT) 5) Issue the quality documentation 6) Clarify the welding processes after pass the inspection testes 7) Surveillance for maintenance of water line equipment 8) Control the calibration of equipments and its certificate

    • Iran
    • Banking
    • 1 - 100 Employee
    • Production Supervisor & Quality Control
      • Jan 2009 - Jan 2010

      1) Design & produce steel structure to be installed at oil & gas industrial 2) Control the quality of welding on steel structure as per project procedure 3) Control the cutting plan for row material accordance client drawing 4) Surveillance of NDE testes and issuing the relevant documentation 5) Design & produce the structures for building warehouses & workshops 6) Provide & establish welding final book to be submitted to client 7) Erection of structures at field accordance with drawing Show less

    • Iran
    • Marketing Services
    • 1 - 100 Employee
    • Production Supervisor
      • Aug 2007 - Jan 2009

      Novin is an industrial company to design & produce some components in mine machines & mine equipment field. 1) Design & produce the industrial components in field mine machines 2) Control the quality of production to be as per client order 3) Manage the man powers to control the discipline and get best results 4) Prepare the documents of productions 5) Control the main machines at produce line 6) Maintenance the main machines Novin is an industrial company to design & produce some components in mine machines & mine equipment field. 1) Design & produce the industrial components in field mine machines 2) Control the quality of production to be as per client order 3) Manage the man powers to control the discipline and get best results 4) Prepare the documents of productions 5) Control the main machines at produce line 6) Maintenance the main machines

Education

  • University of Iran-Qazvin branch
    Bachelor of Science (BS), Mechanical Engineering
    2004 - 2008

Community

You need to have a working account to view this content. Click here to join now