Mladen Spasenovski

Production Planning Manager at Remote Group
  • Claim this Profile
Contact Information
Location
Kičevo, North Macedonia, MK
Languages
  • luganda Elementary proficiency
  • english Professional working proficiency
  • Serbian Full professional proficiency
  • Macedonian Native or bilingual proficiency
  • Russian Elementary proficiency
  • Albanian Elementary proficiency
  • French Limited working proficiency
  • German Elementary proficiency
  • Italian Elementary proficiency
  • Spanish Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Brazil
    • Events Services
    • 1 - 100 Employee
    • Production Planning Manager
      • May 2023 - Present

      Bugesera Airport is located in southeastern Rwanda, in Bugesera District, near the town of Rilima.[3] This location is approximately 25 kilometres (16 mi), by air, and about 40 kilometres (25 mi), by road, south of Kigali International Airport. Bugesera Airport is located in southeastern Rwanda, in Bugesera District, near the town of Rilima.[3] This location is approximately 25 kilometres (16 mi), by air, and about 40 kilometres (25 mi), by road, south of Kigali International Airport.

    • Software Development
    • 1 - 100 Employee
    • Resident Engineer
      • Jul 2021 - Jun 2023
    • United Arab Emirates
    • International Trade and Development
    • 500 - 600 Employee
    • Project Manager
      • Jan 2021 - Jul 2021

      1 UNITED NATIONS INTERIM SECURITY FORCE IN ABYEI (UNISFA) PROVISION OF CONTRACTUAL CAPICITY TO ENHANCE FORCE MOBILITY UTILIZING SPECIALIZED WORKERS FOR ROAD REPAIRS AND CAMP IMPROVEMENT WORKS IN UNISFA AREAS OF OPERATION UNISFA has approximately 4200 troops on board stationed at 13 team sites within Abyei box plus 5 JBVMM sites outside the box. The troops require movement from one to another team site which are mainly connected by means of earth roads. As a part of UNISFA mandate, troops are required to conduct ground patrols and keep supply routes open as much as possible to all team sites and vicinity areas all year round. UNISFA mission area has rainy season almost for 6 months per year starting from June to November. Almost all roads are flooded during rainy season and severely damaged by flood at different sections resulting disconnection for the supply and patrol roads. Engineering has estimated that approximately 500km of major and subsidiary roads are required to plan every year for regular/routine repair and maintenance during and after rainy season. Some roads also connect further to Port Sudan which is a major supply route from Sea Port to UNISFA HQ. Show less

    • Managing Director AT LINDI JTD
      • Mar 2019 - Jan 2021

      CIVIL ENGINEERING IN CONSTRUCTION OF ALL TYPE OF STRUCTURES ,RECONSTRUCTION OF OLD HISTORICAL FORTIFICATION,WATER SUPPLY,SOLAR SYSTEM,DAMS,LAND ESCAPE,BUILDINGS,ROADS ,BRIDGES,PLANING ,WASTEWATER SOLUTION,MODULAR UNITS FOR LEAVING ,HOSPITALS,STATION,AIRPORTS,DRAINAGE SYSTEMS ECT.. CIVIL ENGINEERING IN CONSTRUCTION OF ALL TYPE OF STRUCTURES ,RECONSTRUCTION OF OLD HISTORICAL FORTIFICATION,WATER SUPPLY,SOLAR SYSTEM,DAMS,LAND ESCAPE,BUILDINGS,ROADS ,BRIDGES,PLANING ,WASTEWATER SOLUTION,MODULAR UNITS FOR LEAVING ,HOSPITALS,STATION,AIRPORTS,DRAINAGE SYSTEMS ECT..

    • Operations Project Manager
      • Mar 2017 - Jan 2021

      Work work and only work Responsible for complete operation works(company haw different projects mostly in wather supply,reservoar for water treatment,sewage systems,pipe line under pressure ,road designer consultancy , preparing records and reports for the management on works carried out. Project implemented under the European Union fund water/sewage/road sector. Works based on FIDIC conditions of contract. Value of all project was 250 million $. Work work and only work Responsible for complete operation works(company haw different projects mostly in wather supply,reservoar for water treatment,sewage systems,pipe line under pressure ,road designer consultancy , preparing records and reports for the management on works carried out. Project implemented under the European Union fund water/sewage/road sector. Works based on FIDIC conditions of contract. Value of all project was 250 million $.

    • /PROJECT MANAGER /CHIEF SURVEYOR/SITE ENGINEER/DESIGN ENGINEER
      • Apr 2010 - Mar 2017

      road design,feasibility study,detailed engineering design, Responsible for complete survey works(6 survey teams with 45 workers) including setting out, determining the expropriation line, control levels, preparing records and reports for the management on works carried out. Project implemented under the European Union fund road sector. Project involved construction of complete lane motorway in direction of Mbarara-Kabale(137km), Phase I with traffic lane 2 x 3.50 m, stop lane 1.00-3.00 m with hard shoulders. Project includes asphalting Kisoro-Bunagana,Sout diversion and Kisoro-Kyanika road(total 29 km ),Kisoro link 2.3km),Kisoro-Mutebile hospital road (6.5km),design and preparation works for Hoima airport, reconstruction of 4 bridges, electrical transmission lines, dislocation of electrical transmission lines, optical cable lines,wather line and irrigation pipelines, drainage channels and structures, traffic signs and signalization, provision of uninterrupted and safe traffic during construction period. Works based on FIDIC conditions of contract. Value of project was 190 million $. Responsible for complete survey works(6 survey teams with 40 workers) including setting out, determining the expropriation line, control levels, preparing records and reports for the man Project implemented under the African development fund road sector. Project involved construction of complete lane motorway in direction of Kabale –Kisoro(88km), Phase I with traffic lane 2 x 3.00 m, stop lane 1.00 m with hard shoulders. Project includes Kisoro-Bunagana, South diversion and Kisoro-Kyanika road(29km), reconstruction of electrical transmission lines, dislocation of electrical transmission lines and irrigation pipelines, drainage channels and structures, traffic signs and signalization, provision of uninterrupted and safe traffic during construction period. Works based on FIDIC conditions of contract. Value of project was 150 million $agreement on works carried out. Show less

    • PROJECT MANAGER/assistant project manager
      • Jan 2007 - Mar 2011

      Responsible for complete survey/Assistant project manager works including setting out, determining the expropriation line, control levels, preparing records and reports for the management on works carried out. Supervising on construction complex building in Podgorica Monte Negro. Project Atlas Capital center. Value of project was 96 million euro. Works done under FIDIC standards. Atlas Capital Centre offers a Class A office, retail and residential environment that distinguish it from the competition, making it a one-of-a-kind in the region. The project will be developed as a mixed-use project which will comprise retail and residential space in order to capitalize on the synergies of all those developments and to generate additional traffic to the area. According to the preliminary plans, Atlas Capital Centre will include 12,900 m2 of residential space (apartments will range in sizes from 80 to 340 m2), 23,800m2 of office space, 13,900 m2 of retail space, 3,210 m2 will be reserved for restaurants and bars and 530 m2 for a conference room. The developer plans to include a three-level garage space, which will be placed in an area of 23,000 m2, and which will certainly differentiate the project by addressing the issue of residents parking. From 01.2009-03.2011 work like Assistant Site Project Manager and head Surveyor for The Embassy of the United States of America new Consular Annex and Physical Security Upgrade project. Show less

    • United States
    • Government Administration
    • PROJECT MANAGER/CHIEF ENGINEER
      • Jan 2006 - Jan 2007

      project in Korca R.Albania Water and sewage system with WTP for city Korca under FIDIC regulative, Waste water recycle system, Atmospheric water recycle system,ect project in Korca R.Albania Water and sewage system with WTP for city Korca under FIDIC regulative, Waste water recycle system, Atmospheric water recycle system,ect

Education

  • st KIRIL &METHODI SKOPJE R.MACEDONIJA
    Bachelor of Science (BSc)
    1990 - 1993
  • CIRIL AND METHODI SKOPJE
    DIPLOMA, DIPLOMA
    1989 - 1993
  • GDUC ZDRAVKO CVETKOVSKI SKOPJE
    1987 - 1989

Community

You need to have a working account to view this content. Click here to join now