Luqman Siddique
Asst. Project Manager at CCC Engineering Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
CCC Engineering Ltd.
-
China
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Asst. Project Manager
-
Nov 2015 - Present
Projects: 1) Design, Manufacturing, Supply, Installation, Testing and Commissioning of following equipment at Tarbela Switchyard 3x 150 MVA, 500/200KV Auto Transformer, 500KV Circuit Breaker, 500KV Current Transformers, 500 KV Disconnector Switch, 500Kv Bus Bars and 500KV Surge Arrestors. 2) Procurement, Design, Supply And Installation of Three (3) Nos. Conversions From 66KV to 132KV Air Insulated Switchgear (AIS) Substation for HESCO at: i. Tando Ghulam Ali Along With Allied Transmission Line ii. Digri Along With Allied Transmission Line iii. Tando Jan Mohammad Along With Allied Transmission Line 3) Procurement of Plant Design, Supply, Installation, Testing, Commissioning and Civil Works of Two (02) No. New 132KV Grid Station at: i. Gajjumatta, District Lahore ii. Sadhoki, District Lahore Along with Associated 132KV Double Circuit Feed Transmission Line on Turnkey Basis. . Tendering of EPC Grid Station, Transmission Lines and Power Plant Projects. • Preparation of Technical Data/Drawings, its subsequent submission and getting necessary approval from client. • Project Planning, Monitoring and Control. • Manage transportation of local and foreign equipment to site, their safe unloading, • Manage and Supervise Installation, Testing and Commissioning of Equipment at site. • Responsible for Contractual Correspondence and Monthly Progress Reports. • Ensure proper invoicing, collection of payments, proper project closing and hand over. • Familiar with various banking modes of payment, their procedure, payment & performance guarantees, insurances, custom clearance, taxation etc. . Clearance of punch lists and issuance of FCC, OAC and final handing over/taking over of site and material. • Responsible for all the documentation and keeping all the record up to date. • Hands-on experience on Testing & Commissioning of all Switchyard Equipment i.e. Auto Transformer, Circuit Breakers, Current Transformers, Disconnector Switches Surge Arrestors. Show less
-
-
-
Pak Elektron Limited
-
Pakistan
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Intern
-
Aug 2015 - Sep 2015
Learned a lot about different types of transformers, their manufacturing and testing. Learned a lot about different types of transformers, their manufacturing and testing.
-
-
Education
-
National University of Computer and Emerging Sciences
Bachelor's degree, Electrical Engineering (Computer Engineering)