Korhan Kevin Tukaci
Junior Construction Scheduler at Group PMX- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Turkish Native or bilingual proficiency
Topline Score
Bio
Credentials
-
Construction Management: Planning and Scheduling
LinkedInApr, 2022- Sep, 2024 -
Excel Essential Training(Office 365/Microsoft 365)
NASBAMar, 2022- Sep, 2024 -
Primavera P6 Enterprise Project Portfolio Management Essentials
Plan Academy Inc.Oct, 2021- Sep, 2024 -
Construction Project Management
EmeritusJan, 2021- Sep, 2024
Experience
-
Group PMX
-
United States
-
Construction
-
1 - 100 Employee
-
Junior Construction Scheduler
-
Feb 2022 - Present
-
-
-
Dandana
-
United States
-
Restaurants
-
1 - 100 Employee
-
Business Owner
-
Jun 2014 - 2017
-
-
-
-
Automotive Quality Engineer
-
Jan 2011 - Dec 2013
• Responsible for all Quality Management activities in the fabrication department, including documentation and systems improvement. • Solved complex Unipres problems in manufacturing methods by utilizing seven tools of quality and additional statistical methodologies. • Performed final inspection and testing to ensure items were fit for customer application. • Developed an additional testing phase that increased efficiency and decreased ppm defects • Responsible for all Quality Management activities in the fabrication department, including documentation and systems improvement. • Performed final inspection and testing to ensure items were fit for customer application. • Collaborated with Purchasing to introduce effective cost-reduction methods for the engineering and fabrication departments. Show less
-
-
-
-
Summer Intern
-
Jun 2008 - Aug 2008
• Interfaced with clients and helped to develop a centralized customer database to keep track of all order processing • Installed various parts such as radiators, belts, alternators, and others for 100 clients resulting in a 20% uplift efficiency • Established quality controls to reinforce maintenance and safety procedures • Interfaced with clients and helped to develop a centralized customer database to keep track of all order processing • Installed various parts such as radiators, belts, alternators, and others for 100 clients resulting in a 20% uplift efficiency • Established quality controls to reinforce maintenance and safety procedures
-
-
-
-
Internship: Assistant Technical Manager
-
Jul 2007 - Aug 2007
✓Tested parts and materials to optimize strength to weight ratio ✓Projected and designed solutions related to thermal energy and industrial fluid ✓Projected structure and design of machines, tools and components, including design and computer-aided manufacturing-CAD ✓Tested parts and materials to optimize strength to weight ratio ✓Projected and designed solutions related to thermal energy and industrial fluid ✓Projected structure and design of machines, tools and components, including design and computer-aided manufacturing-CAD
-
-
Education
-
University of Alabama at Birmingham
Master of Engineering - MEng, Construction Engineering Management -
Columbia University in the City of New York
Construction Project management -
Dicle Üniversitesi
Bachelor of Applied Science (B.A.Sc.), Mechanical Engineering -
Dowling College
Master of Business Administration (MBA) -
NLP Professional Training Program, Adana Turkey
Neuro Linguistic Programming-NLP and Sales Mastery