Keith Webb

Offshore Installation Manager at Global Offshore
  • Claim this Profile
Contact Information
Location
Preston, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Offshore Installation Manager
      • Dec 2020 - Jan 2021

      Walk-to-work vessel - inter-array cable installation and test/termination Walk-to-work vessel - inter-array cable installation and test/termination

    • Luxembourg
    • Construction
    • 700 & Above Employee
    • Cable Installation Superintendent
      • Jul 2020 - Sep 2020

      Installation of the inter-array cables and 2nd end pull-ins of the wet stored export cables Installation of the inter-array cables and 2nd end pull-ins of the wet stored export cables

    • Cable Trenching Superintendent
      • Nov 2019 - Jan 2020

      North Wester 2 – trenching inter-array and export cables North Wester 2 – trenching inter-array and export cables

    • Netherlands
    • Utilities
    • 100 - 200 Employee
    • Client Representative
      • Oct 2019 - Oct 2019

      GT1 and Albatros – PLIB works GT1 and Albatros – PLIB works

    • Cable Installation Superintendent
      • Jul 2019 - Aug 2019

      Replaced 2 inter-array cables/CPS at Borkum Riff Grund 1 Replaced 2 inter-array cables/CPS at Borkum Riff Grund 1

    • Client Representative
      • Jun 2019 - Jul 2019

      Vessel mobilisation, then near-shore jointing (2 x HVDC cables) at KP22 – NordLink project - shallow water <10m

    • Client Representative
      • Feb 2019 - May 2019

      Entire HoHeSee Project - PLGR, cable load-out, installation of 3 export cables then burial – HoHeSee/BorWin Gamma

    • Client Representative
      • Jun 2018 - Oct 2018

      Cobra Cable Project – jointing operations – 2 x HVDC and 1 x FO cable – 3 joints. BorWin3 mobilisation/cable load; cable jointing; simultaneous cable installation/ploughing – an export cable bundle consisting of 2 x HVDC cables and one fibre optic cable – KP107 to KP71 Cobra Cable Project – jointing operations – 2 x HVDC and 1 x FO cable – 3 joints. BorWin3 mobilisation/cable load; cable jointing; simultaneous cable installation/ploughing – an export cable bundle consisting of 2 x HVDC cables and one fibre optic cable – KP107 to KP71

    • Cable Installation Superintendent
      • Mar 2018 - Apr 2018

      Cable load out, Hellenic Cable factory to CLV Willem de Vlamingh, Greece, then installation of 3 export cables – TWB OSS to DWA OSS and two between DWG OSS and BR2 OSS

    • Cable Trenching Superintendent
      • Mar 2018 - Mar 2018

      NASR Phase II – T1 trencher/MV Bernoulli, Arabian Gulf

    • Client Representative
      • Oct 2017 - Nov 2017

      BorWin3 simultaneous cable installation/ploughing – an export cable bundle consisting of 2 x HVDC cables and one fibre optic cable – KP107 to KP67

    • Client Representative
      • Aug 2017 - Sep 2017

      Cobra Cable Project – Fanø to Jutland (Denmark) cable installation – 2 x HVDC cables and one fibre optic cable – shore end pull-ins both side of the channel and simultaneous lay of the three cables

    • Cable Installation Superintendent
      • Jun 2017 - Jun 2017

      MV Willem de Vlamingh – Race Bank export cable installation MV Willem de Vlamingh – Race Bank export cable installation

    • United States
    • Consumer Goods
    • Project Superintendent
      • Mar 2017 - Apr 2017

      PLGR on the Race Bank and Walney 3 extension wind farms. PLGR on the Race Bank and Walney 3 extension wind farms.

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Offshore Project Manager
      • Jul 2016 - Sep 2016

      AHV Island Valiant – Pierce Field (UK Sector – North Sea) – replaced 2 mooring line systems on the Haewene Brim FPSO (UWS, MCS ‘A’, buoyancy module, MCS ‘B’ and joined MCS ‘B’ to MCS ‘C’ and straightened). Replaced 3 anchor line systems on the Haewene Brim FPSO (MCS ‘A’, buoyancy module, MCS ‘B’ and joined MCS ‘B’ to MCS ‘C’ and straightened) – ROV Magnum AHV Island Valiant – Pierce Field (UK Sector – North Sea) – replaced 2 mooring line systems on the Haewene Brim FPSO (UWS, MCS ‘A’, buoyancy module, MCS ‘B’ and joined MCS ‘B’ to MCS ‘C’ and straightened). Replaced 3 anchor line systems on the Haewene Brim FPSO (MCS ‘A’, buoyancy module, MCS ‘B’ and joined MCS ‘B’ to MCS ‘C’ and straightened) – ROV Magnum

    • United States
    • Consumer Goods
    • Project Superintendent
      • Dec 2015 - Jun 2016

      MV Atlantic Tonjer then MV Atlantic Carrier – Adlergrund West Windfarm – Boulder clearance (ROGE – Remotely Operated Grab Equipment) MV Atlantic Tonjer then MV Atlantic Carrier – Adlergrund West Windfarm – Boulder clearance (ROGE – Remotely Operated Grab Equipment)

    • Offshore Manager
      • Sep 2015 - Nov 2015

      MV Noordhoek Pathfinder – Burbo Bank 2 – UXO clearance (CS2 WROV) MV Noordhoek Pathfinder – Burbo Bank 2 – UXO clearance (CS2 WROV)

    • Belgium
    • Mining
    • 1 - 100 Employee
    • Client Representative
      • Jul 2015 - Sep 2015

      BorWin/GodeWind1 mattress installation, PLGR and mobilisation of MV Elektron for support role during 2 export cable installations at BorWin/GodeWind1.

    • Client Representative
      • Apr 2015 - Jun 2015

      Ayatsil Field, Bay of Campeche (Gulf of Mexico) – power cable installation between multiple platforms and a subsea PLEM, fall-pipe rock dumping to create rock berms.

    • Information Technology & Services
    • Offshore Installation Manager
      • Sep 2014 - Nov 2014

      Modus Seabed Intervention Ltd. – MV Jan Steen – Luchterduinen Offshore Wind Farm, Netherlands – inter-array cable trenching Modus Seabed Intervention Ltd. – MV Jan Steen – Luchterduinen Offshore Wind Farm, Netherlands – inter-array cable trenching

    • Offshore Installation Manager
      • Apr 2014 - Aug 2014
    • Offshore Installation Manager
      • Feb 2014 - Mar 2014
    • Norway
    • Oil and Gas
    • 100 - 200 Employee
    • Shift Superintendent
      • Oct 2013 - Dec 2013
    • Offshore Manager
      • Apr 2013 - Oct 2013

    • Bridge Superintendent
      • Apr 2008 - Apr 2013

    • Construction
    • 1 - 100 Employee
    • Offshore Manager
      • Oct 2006 - Feb 2008
    • Acting Chief Systems Engineer (Subsea)
      • Oct 1998 - May 2006

      Started as ROV trainee and rose through the ranks to Acting Chief Systems Engineer (Subsea) Started as ROV trainee and rose through the ranks to Acting Chief Systems Engineer (Subsea)

Education

  • Bournemouth University
    HND, Computer Aided Engineering
    1990 - 1992
  • Bournemouth University
    HNC, Mechanical Engineering
    1988 - 1990
  • Weymouth College
    ONC, Mechanical Engineering
    1985 - 1988

Community

You need to have a working account to view this content. Click here to join now