Kasra Rasooli
Project Coordinator at Complete Utility Contractors Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Persian Native or bilingual proficiency
-
Spanish Elementary proficiency
Topline Score
Bio
Credentials
-
Excel 2016 Essential Training
Lynda.comJan, 2019- Sep, 2024 -
On the Job Site: Construction
Lynda.comJan, 2019- Sep, 2024
Experience
-
Complete Utility Contractors Ltd.
-
Canada
-
Construction
-
1 - 100 Employee
-
Project Coordinator
-
Jun 2019 - Present
-
-
-
Proactive Hazmat
-
Canada
-
Construction
-
1 - 100 Employee
-
Level 1 Hazmat crew technician
-
Jan 2019 - May 2019
-Worked in teams of 2-10 under the supervision of the foreman or superintendent to ensure safe abatement and remediation of hazardous materials (Asbestos, lead, mould) from project sites. -Used a variety of hand tools and power tools as required. -Performed fit tests, participated in toolbox meetings, and signed field level hazard assessments and safe work procedures for moderate to high risk projects. -Contributed to the work being performed within WorkSafe BC standards in a timely manner and to budget (within $20 thousand to $5 million) -Worked along with different trades and read reports from environmental consultants to ensure safe practices and to ensure work is within scope. Show less
-
-
-
-
General Laborer / Supervisor
-
Sep 2018 - Oct 2018
-Communicated with the general contractor and client to seal the proper working parameter using plastic sheeting (poly). Removed the required drywall and insulation, and properly disposed of the debris -Organized transportation from site to site and maintained timekeeping and records -Familiarized new employees with the work environment -Adhered to the safety requirements of working with the removal of asbestos -Communicated with the general contractor and client to seal the proper working parameter using plastic sheeting (poly). Removed the required drywall and insulation, and properly disposed of the debris -Organized transportation from site to site and maintained timekeeping and records -Familiarized new employees with the work environment -Adhered to the safety requirements of working with the removal of asbestos
-
-
-
Domino's
-
Canada
-
Internet Publishing
-
1 - 100 Employee
-
Delivery Driver / Pizza Maker
-
Sep 2016 - Aug 2018
-Took orders over the phone, prepared and delivered the orders and received payment -Assisted in training new employees -Consistently achieved the highest sales of the day at closing shifts -Took orders over the phone, prepared and delivered the orders and received payment -Assisted in training new employees -Consistently achieved the highest sales of the day at closing shifts
-
-
-
-
Engineering Intern
-
Apr 2017 - Aug 2017
-Aided the senior engineer on the field and the lab manager in quality control, using ISIRI standards (based on CSA/ACI and ASTM standards) for concrete production. -Tested the soil quality and the final concrete samples used in buildings and learned about dealing with complications arising from different factors for clients through hands- on experience. -Observed and took notes on site visits during concrete pourings of commercial buildings. -Aided the senior engineer on the field and the lab manager in quality control, using ISIRI standards (based on CSA/ACI and ASTM standards) for concrete production. -Tested the soil quality and the final concrete samples used in buildings and learned about dealing with complications arising from different factors for clients through hands- on experience. -Observed and took notes on site visits during concrete pourings of commercial buildings.
-
-
-
Roof Truss Co
-
United States
-
Civil Engineering
-
1 - 100 Employee
-
Assistant to Senior Engineer
-
Apr 2016 - Aug 2016
-Assisted on the construction of a 12 story steel structure building. Printed and read drawings of given sections designed on Tekla Structures. -Responsible for proper assembly of steel brackets throughout the building. Inspected the welding locations and improved joint welding time by 30% by rerouting the welding path. -Assisted on the construction of a 12 story steel structure building. Printed and read drawings of given sections designed on Tekla Structures. -Responsible for proper assembly of steel brackets throughout the building. Inspected the welding locations and improved joint welding time by 30% by rerouting the welding path.
-
-
Education
-
The University of British Columbia
Bachelor's of Applied Science, Civil Engineering