Kasra Rasooli

Project Coordinator at Complete Utility Contractors Ltd.
  • Claim this Profile
Contact Information
Location
Canada, CA
Languages
  • English Full professional proficiency
  • Persian Native or bilingual proficiency
  • Spanish Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Excel 2016 Essential Training
    Lynda.com
    Jan, 2019
    - Sep, 2024
  • On the Job Site: Construction
    Lynda.com
    Jan, 2019
    - Sep, 2024

Experience

    • Canada
    • Construction
    • 1 - 100 Employee
    • Project Coordinator
      • Jun 2019 - Present
    • Canada
    • Construction
    • 1 - 100 Employee
    • Level 1 Hazmat crew technician
      • Jan 2019 - May 2019

      -Worked in teams of 2-10 under the supervision of the foreman or superintendent to ensure safe abatement and remediation of hazardous materials (Asbestos, lead, mould) from project sites. -Used a variety of hand tools and power tools as required. -Performed fit tests, participated in toolbox meetings, and signed field level hazard assessments and safe work procedures for moderate to high risk projects. -Contributed to the work being performed within WorkSafe BC standards in a timely manner and to budget (within $20 thousand to $5 million) -Worked along with different trades and read reports from environmental consultants to ensure safe practices and to ensure work is within scope. Show less

    • General Laborer / Supervisor
      • Sep 2018 - Oct 2018

      -Communicated with the general contractor and client to seal the proper working parameter using plastic sheeting (poly). Removed the required drywall and insulation, and properly disposed of the debris -Organized transportation from site to site and maintained timekeeping and records -Familiarized new employees with the work environment -Adhered to the safety requirements of working with the removal of asbestos -Communicated with the general contractor and client to seal the proper working parameter using plastic sheeting (poly). Removed the required drywall and insulation, and properly disposed of the debris -Organized transportation from site to site and maintained timekeeping and records -Familiarized new employees with the work environment -Adhered to the safety requirements of working with the removal of asbestos

    • Canada
    • Internet Publishing
    • 1 - 100 Employee
    • Delivery Driver / Pizza Maker
      • Sep 2016 - Aug 2018

      -Took orders over the phone, prepared and delivered the orders and received payment -Assisted in training new employees -Consistently achieved the highest sales of the day at closing shifts -Took orders over the phone, prepared and delivered the orders and received payment -Assisted in training new employees -Consistently achieved the highest sales of the day at closing shifts

    • Engineering Intern
      • Apr 2017 - Aug 2017

      -Aided the senior engineer on the field and the lab manager in quality control, using ISIRI standards (based on CSA/ACI and ASTM standards) for concrete production. -Tested the soil quality and the final concrete samples used in buildings and learned about dealing with complications arising from different factors for clients through hands- on experience. -Observed and took notes on site visits during concrete pourings of commercial buildings. -Aided the senior engineer on the field and the lab manager in quality control, using ISIRI standards (based on CSA/ACI and ASTM standards) for concrete production. -Tested the soil quality and the final concrete samples used in buildings and learned about dealing with complications arising from different factors for clients through hands- on experience. -Observed and took notes on site visits during concrete pourings of commercial buildings.

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Assistant to Senior Engineer
      • Apr 2016 - Aug 2016

      -Assisted on the construction of a 12 story steel structure building. Printed and read drawings of given sections designed on Tekla Structures. -Responsible for proper assembly of steel brackets throughout the building. Inspected the welding locations and improved joint welding time by 30% by rerouting the welding path. -Assisted on the construction of a 12 story steel structure building. Printed and read drawings of given sections designed on Tekla Structures. -Responsible for proper assembly of steel brackets throughout the building. Inspected the welding locations and improved joint welding time by 30% by rerouting the welding path.

Education

  • The University of British Columbia
    Bachelor's of Applied Science, Civil Engineering
    2014 - 2018

Community

You need to have a working account to view this content. Click here to join now