Karen Pitre

Sales Associate at PART TIME JOBS
  • Claim this Profile
Contact Information
Location
Baton Rouge, Louisiana, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Retail
    • 1 - 100 Employee
    • Sales Associate
      • May 2023 - Present
    • United States
    • Advertising Services
    • 1 - 100 Employee
    • Instrumentation Designer
      • Apr 2019 - Apr 2020

      ExxonMobil, BRPO, PP-2 Line Growth Used SmartPlant™Instrument Index module to create tag and loop numbers; Specification module to generate instrument specifications and Wiring module to create panels of different types and connect devices for instrument signals and loop creation. Assign field-termination assembly (FTA) to rack IOTA’s. Create control-system tags from instruments and assign to I/O in DCS. ExxonMobil, Tank Repairs Project (2019) 15 Various Tanks Work closely with E&I Designer, Thomas Hughes, since new to ExxonMobil. Responsible for drawing, in AutoCAD™, revisions to tank gauging-junction box-wiring diagrams, instrument-installation details and instrument location plans, key plan, drawing index, purchase order List, nameplate schedule and scope of work. Installation details include level switches, control valve pneumatics, level transmitters, RTD’s, grounding and conduit fittings. ExxonMobil, LOLA F-402 TRICONEX UPGRADE Work closely with E&I Designer, Mike LeBlanc, since new to ExxonMobil. On drawings and details, disconnect existing multipair cable in PLC cabinet and instrument-junction box. Route 120V AC power to new PLC cabinet using existing underground stub ups and additional overhead conduit. Route new multipair cable from existing junction box to new PLC cabinet. Route fiber cable from existing junction box to new PLC cabinet and terminate both ends. Re-route existing ROCC loops from existing field boxes to new PLC cabinet. This project required several field trips to verify conduit and cable routing and to as-built existing panels. AutoCAD™ 2014. Responsible for design in AutoCAD™, the installation details and conduit and cable details between all panels. Show less

    • Instrumentation Designer
      • Feb 2011 - Apr 2020

      Follow a written-project scope of work, using engineering standards, pipe specs and the National Electric Code as required to assemble a complete design package for construction. Generate labor bills and construction scope of work. Coordinate with field-construction personnel if any problems arise while the job is being installed. Responsible for specifying and requesting quotes for: - Pressure and temperature transmitters using instrument process data sheets and Dow software, Propix. - Automated Block Valves Responsible for writing material specification transmittal for procurement of all instruments on a specific project. As an INtools™ Instrument Designer, responsible for using: Instrument Index module to create tag and loop numbers; Browser Manager to view, modify, filter, and sort data as needed; Specification module to generate instrument specifications; and Wiring module to create panels of different types and connect devices for instrument signals and loop creation. Instrument design experience includes generating demolition schedules, cable schedules, construction and detail schedules, instrument location and conduit routing plans, installation details, junction box wiring diagrams and loop diagrams and construction scope of work. Show less

    • Staffing and Recruiting
    • 1 - 100 Employee
    • Instrumentation Designer
      • Nov 2008 - May 2009

      Instrumentation and Control Systems design leading to the development and assembly of work packages for all instrumentation related drawings; develop P&ID’s, location plans, loop sheets, schematics, panel drawings, PLC cabinet drawings, including local control panels. Piping and Instruments were routed and mounted inside a climate controlled shelter for a project being built on the North Slope for a company in Italy. I was contracted to Arctic Slope Regional Corporation, a utility company based in Anchorage, Alaska. Show less

    • Instrumentation Designer
      • Jan 2002 - Feb 2006

      Follow a written-project scope of work, using engineering standards, pipe specs and the National Electric Code as required to assemble a complete design package for construction. Generate labor bills and construction scope of work. Coordinate with field-construction personnel if any problems arise while the job is being installed. As an INtools™ Instrument Designer, responsible for using: Instrument Index module to create tag and loop numbers; Browser Manager to view, modify, filter, and sort data as needed; Specification module to generate instrument specifications; and Wiring module to create panels of different types and connect devices for instrument signals and loop creation. Instrument design experience includes generating cable schedules, instrument location and conduit routing plans, installation details, junction box wiring diagrams and loop diagrams. Re-feed 480V motors from existing MCC to new MCC starters, design 480V motor elementary diagrams from P&ID’s and order new control stations for all motors. Show less

    • Netherlands
    • Retail Office Equipment
    • 1 - 100 Employee
    • Controls System Designer
      • Dec 1993 - Nov 2001

      Instrument design experience includes generating cable schedules, instrument location and conduit routing plans, installation details, junction box wiring diagrams and loop diagrams. Designed outdoor lighting generating lighting calculations to produce lighting plans, lighting fixture schedules, circuit loading in the power panel, calculate total watts, line amps and kVA. Size cable for 15kV transformer to provide power for the lighting panel. Assignments included: FCCU Project for Chevron Refinery – Richmond, California Aniline and NVP/PVP Projects for BASF Corporation – Geismar, Louisiana HF Reactor Replacement Project for Exxon Refinery – Billings, Montana Vistalon Finishing Unit Modification Project for Exxon Chemical, Baton Rouge, LA Show less

    • Barnard & Burk Corporation
      • Mar 1987 - Feb 1989

      Instrument drafting experience includes drawing and/or revising instrument location and conduit routing plans, installation details, junction box wiring diagrams and loop diagrams. Instrument drafting experience includes drawing and/or revising instrument location and conduit routing plans, installation details, junction box wiring diagrams and loop diagrams.

    • Instrumentation Draftsman
      • Aug 1985 - Mar 1987
    • Information Services
    • 1 - 100 Employee
    • Geo-Technical Draftsman
      • Apr 1984 - Aug 1985

      Draw with ink on mylar, cross sections of the earth. IT was a hazardous waste company. Dappalonia was there engineering side. Worked part-time while attending LSU full time. Draw with ink on mylar, cross sections of the earth. IT was a hazardous waste company. Dappalonia was there engineering side. Worked part-time while attending LSU full time.

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • P&ID Draftsman
      • Sep 1983 - Feb 1984

      Manual drafting of P&IDs for a chemical engineer. Part-time while attending LSU. Manual drafting of P&IDs for a chemical engineer. Part-time while attending LSU.

    • Instrumentation Draftsman
      • May 1982 - Mar 1983

      Field walk downs and sketching as-built P&IDs. Field walk downs and sketching as-built P&IDs.

    • Instrumentation Draftsman
      • Jul 1979 - Apr 1982

      Instrument drafting experience includes red-line pickups which were marked up by designer for instrument location and conduit routing plans, installation details, junction box wiring diagrams and loop diagrams. Instrument drafting experience includes red-line pickups which were marked up by designer for instrument location and conduit routing plans, installation details, junction box wiring diagrams and loop diagrams.

Education

  • Louisiana State University
    Attended full time 1983 - 1985, completed 60 hrs Business Adminstration
    1983 - 1985
  • ABC Contractors' Merit Training Center, Baton Rouge, Louisiana
    Certificate of Completion, 2001 - 2005, Night School, Industrial-Instrumentation Construction
  • Louisiana State University
    Short Course 1982, Instrument & Electrical Design Drafting
  • Louisiana State University
    Short Course 1988, Industrial Instrument Drafting/Design
  • Louisiana Technical College-Baton Rouge, Louisiana
    Certificate of Completion-Basic Drafting, 1979-1981, Industrial Drafting

Community

You need to have a working account to view this content. Click here to join now