Ivan Fugaš

at LNG Croatia
  • Claim this Profile
Contact Information
Location
Zagreb, Zagreb, Croatia, HR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Croatia
    • Oil and Gas
    • 1 - 100 Employee
      • Jun 2023 - Present

      • May 2020 - Jun 2023

      LNG FSRU Terminal Omišalj - project development and implementation, construction supervisor, EPC supervisor, HAZID/HAZOP/Risk assessment, pre commissioning and commissioning, start-up of Terminal and Special Purpose Port LNG Terminal Omišalj-Njivice, - responsible for safe and reliability operation, maintenance, commercial and regulatory management of LNG Terminal including Marine operations (jetty maintenance, HP loading arms, pipeline maintenance)- development of CMMS and PIMS for Terminal- due diligence processes, development of marine infrastructure- HSE coordinator- coordination with Users of the Terminal- Procurement: preparing tender documentation, managing the selection- Finance: budget planning of departments and projects, technical evaluation, and cost estimation FSRU LNG Croatia – supervising activities on conversion of LNG carrier Golar Viking to FSRU ship LNG Croatia, start-up, commissioning - operation and maintenance supervisor, supervise cargo operation (discharge, rate calculations, BOG management) Ship to Ship Operation (small scale LNGC, large scale LNGC) - planning daily/monthly and yearly rates of natural gas (after regasification), gas quality and metering management LNG Bunker Station - project manager- development, pre commissioning, commissioning and start-up of first in the world FSRU ship to Truck bunker station Show less

    • Croatia
    • Oil and Gas
    • 1 - 100 Employee
      • Mar 2020 - May 2020

      Responsible for construction and development of Croatian gas pipeline transportation system

      • Jul 2017 - Mar 2020

      - control and development of basic and detailed design (API 5L, API 6D, ANSI 31.8., PED), obtaining construction licenses, engineering analysis- regulation of connection procedure and network connection rules, energy conditions and approval for connecting to the transmission system, gas market research for development of new pipelies- supervising EPC contractors, pre-planning and execution, civil engineering, material specifications, engineering calculations, pre-commissioning and commissioning- monitoring, planning, scheduling and maintenance of pipeline network system and pipeline facilities (gas hubs and nodes, landfall facilities, block stations, pig traps, reductions lines…) hot tapping, technical preparation and supervision of works in the protected zone of pipelines, third party interference- flexible pipe rejuvenation and re-assessment of old pipelines (API 17B and 17J),- hazard analysis and identification on pipelines and plant equipment, emergency actions on pipeline, organize and execution job training and HSE drills - pipeline integrity management: planning, pipeline cleaning, intelligent inspection of pipelines and plant equipment (NDT, ILI, PCM, DCVG), developing and implementing PIMS in Plinacro- construction and maintenance of metering reduction stations: heat exchangers, reduction equipment, valves, gas flow metering equipment, gas analysers and chromatographs- Procurement: preparing tender documentation, managing the selection- Finance: budget planning of departments and projects, technical evaluation and cost estimation Show less

      • Aug 2016 - Mar 2020

      Supervise 35 engineers and 103 pipeline operators, control and responsible for 2700 km of Croatian pipeline system (DN50 to DN 800), 157 metering and pressure reduction station, 267 flow lines and 2 state interconnections (with Slovenia and Hungary)

      • Feb 2016 - Mar 2020

      • Jan 2011 - Mar 2020

      • Mar 2007 - Jan 2011

    • Croatia
    • Oil and Gas
    • 300 - 400 Employee
    • Intership, Well Engineer
      • Mar 2002 - Oct 2006

      - oil and gas drilling operations and planning - wellsite drilling operation, downhole condition and rig equipment utilization - design, prepare and plan well drilling programs, well integrity maintenance - construction and anti-corrosive work on oil and gas pipeline, - maintenance of petrol stations - oil and gas drilling operations and planning - wellsite drilling operation, downhole condition and rig equipment utilization - design, prepare and plan well drilling programs, well integrity maintenance - construction and anti-corrosive work on oil and gas pipeline, - maintenance of petrol stations

Education

  • Faculty of Mining, Geology and Petroleum Engineering
    Master of Petroleum Engineering (MEng.), General petroleum engineering
    1999 - 2006
  • I. Technical School " Nikola Tesla ", Zagreb
    High school, Electrician
    1995 - 1999

Community

You need to have a working account to view this content. Click here to join now