Herdi Pradana

Civil Engineer at PT. Arkonin Engineering Manggala Pratama
  • Claim this Profile
Contact Information
Location
Jakarta, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Excel Essential Training (Microsoft 365)
    LinkedIn
    Mar, 2023
    - Sep, 2024
  • Shortcourse using ArcGIS
    Creative Station
    Mar, 2023
    - Sep, 2024
  • English Proficiency Online Test
    YEC Yureka Edukasi Cipta
    Jan, 2023
    - Sep, 2024
  • Road Works Site Superintendent
    Badan Nasional Sertifikasi Profesi (BNSP)
    Dec, 2022
    - Sep, 2024
  • Autodesk BIM for DAM Design Workshop
    Autodesk
    Nov, 2022
    - Sep, 2024
  • Teaching Japanese at Intermediate Level A2
    The Japan Foundation
    Apr, 2022
    - Sep, 2024
  • Autodesk Revit for MEP Design Workshop
    Autodesk
    Mar, 2022
    - Sep, 2024
  • Revit For Structural Design
    Autodesk
    Mar, 2022
    - Sep, 2024
  • Revit For Architectural Design
    Autodesk
    Feb, 2022
    - Sep, 2024
  • Soil Slope Stability Analysis Using Geostudio Slope /W
    Loker_TeknikSipil
    Feb, 2022
    - Sep, 2024
  • Shortcourse Arcgis Pro and Online
    Geosoftware Community
    Aug, 2020
    - Sep, 2024
  • Technical Course Precast and Prestressed Concrete
    Kementrian Pekerjaan Umum dan Perumahan Rakyat
    Aug, 2020
    - Sep, 2024
  • Microsoft Office Desktop Application
    Trust Training Partners
    Jan, 2017
    - Sep, 2024
  • Student Asistant of Mechanical Material Course
    Himpunan Mahasiswa Teknik Pengairan - Universitas Brawijaya (HMP FT-UB)
    Sep, 2016
    - Sep, 2024

Experience

    • Construction
    • 1 - 100 Employee
    • Civil Engineer
      • May 2023 - Present

      Activities Performed: • Calculated rainfall data over 10 years at 3 rainfall stations for hydrology analysis using Excel program at Serpong-Balaraja section 3 Highway Project. • Created the watershed map using Global Mapper to determine the flood design discharge may occur on the bridge. • Rendered 2D river cross-section and bridge analysis at Serpong-Balaraja section 3 Highway Project using HEC-RAS. • Made hydrology and drainage report for Serpong-Balaraja section 3 Highway Project. Activities Performed: • Calculated rainfall data over 10 years at 3 rainfall stations for hydrology analysis using Excel program at Serpong-Balaraja section 3 Highway Project. • Created the watershed map using Global Mapper to determine the flood design discharge may occur on the bridge. • Rendered 2D river cross-section and bridge analysis at Serpong-Balaraja section 3 Highway Project using HEC-RAS. • Made hydrology and drainage report for Serpong-Balaraja section 3 Highway Project.

    • Indonesia
    • Environmental Services
    • 100 - 200 Employee
    • Assistant Irrigation Expert
      • Apr 2022 - May 2023

      Activities Performed: • Monitor and evaluate the ADB loans project under the Directorate of Irrigation and Lowland, Ministry of Public Works and Housing related to the IPDMIP program. • Implementation of microhydro design and construction in irrigation canals at BWS Nusa Tenggara II generate up to 37 kW of electrical power. • Create database for all the documents related to development and management irrigation program such as Preparation O&M, Management study Right of Way irrigation canals, implementation modernization irrigation at 20 B/BWS. • Achieved the outcome targets validated by ADB up to 40% (466,909 Ha) from the baseline targets (99,085 Ha) • Create minutes of meeting and explainatory note related to the irrigation sector Show less

    • Japan
    • Civil Engineering
    • 200 - 300 Employee
    • Assistant Engineer
      • Sep 2020 - Mar 2022

      Activities Performed: • Supervised construction activity for embankment and excavation works also install precast concrete lining at irrigation canals in Rentang Irrigation Modernization Project (RIMP). • Monitoring construction activity of piling works using precast concrete (CCSP) for 2495 pcs and record the pile depth according to the shop drawings. • Ensure the sand cone test and concrete ready mix are best quality according with technical specifications • Collaborated with team consultant design to revised CAD irrigation canals cross-sections up to 100 drawings related to the addition of precast concrete lining works requested by the owner (BBWS Cimanuk Cisanggarung) • Evaluated sites with owner (BBWS Cimanuk-Cisanggarung), the consultant teams, the contractor teams to figure out exsisting soil canals that affect landslides also verify the progress of construction in the field that has been completed. • Prepared daily, weekly, and monthly reports related with progress of construction in the field implemented by contractors. Show less

    • Freelance
      • Dec 2019 - May 2020

      Activities Performed: Calculated rainfall data over 10 years for hydrology analysis using Excel at Arnih Barat Small Dams Project in Sampang East Java Province. Surveyed to the site for measure of flow velocity using current meter and mapped the weir position of Arnih Barat Small Dams Project in Sampang East Java Province Activities Performed: Calculated rainfall data over 10 years for hydrology analysis using Excel at Arnih Barat Small Dams Project in Sampang East Java Province. Surveyed to the site for measure of flow velocity using current meter and mapped the weir position of Arnih Barat Small Dams Project in Sampang East Java Province

    • Indonesia
    • Education Administration Programs
    • 1 - 100 Employee
    • Head Assistant Lecturer of Mechanic of Material
      • Sep 2016 - Jan 2017

      • Lead 10 student assistants, each assistant handled 10-12 students. • Assisted the student to calculate stucture of Mechanic Material. (Profile of Steel, Anchor bolt Bracing, T beam, etc). • Provided assignment and reviewed test score. • Lead 10 student assistants, each assistant handled 10-12 students. • Assisted the student to calculate stucture of Mechanic Material. (Profile of Steel, Anchor bolt Bracing, T beam, etc). • Provided assignment and reviewed test score.

    • Intern
      • Aug 2016 - Dec 2016

      Activities Performed: • Estimate the volume of canal works (BoQ) at Merden Irrigated Area Rehabilitation Project. • Calculate the depths, velocity, and discharge water from canals to estimated the irrigation water needs requirement. • Used AutoCAD to process data compiled from field and redesign the irrigation canals that needs to rehabilitation. • Create inventory data for the irrigation canals that need to rehabilitation contain photos of canals existing and sketch canals existing. Activities Performed: • Estimate the volume of canal works (BoQ) at Merden Irrigated Area Rehabilitation Project. • Calculate the depths, velocity, and discharge water from canals to estimated the irrigation water needs requirement. • Used AutoCAD to process data compiled from field and redesign the irrigation canals that needs to rehabilitation. • Create inventory data for the irrigation canals that need to rehabilitation contain photos of canals existing and sketch canals existing.

Education

  • University of Brawijaya
    Bachelor of Engineering - BE, Water Resources Engineering

Community

You need to have a working account to view this content. Click here to join now