Gabriel-Dan Batalan
BIM Manager at Waldeck- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Uffe Graaskov Ravn
Gabriel has been a member of my structural design group for the tower foundation of the 1915 Cannakele Bridge in Turkey. All drawing production has been done in the 3D program Tekla where Gabriel has been lead. Gabriel has outstandig level as BIM modeller, works very hard and in addition he has a solid understanding of steel structures and concrete structures. This combination makes Gabriel very valueable and I will give Gabriel my best recommendation.
Barry Magee
I enjoyed working with Gabriel while at Atkins together. Gabriel is a very capable BIM modeller with the advantage of having a good grasp of general engineering principles. Hence you can explain what needs to be modelled and drawn rather than spend hours marking up.
Uffe Graaskov Ravn
Gabriel has been a member of my structural design group for the tower foundation of the 1915 Cannakele Bridge in Turkey. All drawing production has been done in the 3D program Tekla where Gabriel has been lead. Gabriel has outstandig level as BIM modeller, works very hard and in addition he has a solid understanding of steel structures and concrete structures. This combination makes Gabriel very valueable and I will give Gabriel my best recommendation.
Barry Magee
I enjoyed working with Gabriel while at Atkins together. Gabriel is a very capable BIM modeller with the advantage of having a good grasp of general engineering principles. Hence you can explain what needs to be modelled and drawn rather than spend hours marking up.
Uffe Graaskov Ravn
Gabriel has been a member of my structural design group for the tower foundation of the 1915 Cannakele Bridge in Turkey. All drawing production has been done in the 3D program Tekla where Gabriel has been lead. Gabriel has outstandig level as BIM modeller, works very hard and in addition he has a solid understanding of steel structures and concrete structures. This combination makes Gabriel very valueable and I will give Gabriel my best recommendation.
Barry Magee
I enjoyed working with Gabriel while at Atkins together. Gabriel is a very capable BIM modeller with the advantage of having a good grasp of general engineering principles. Hence you can explain what needs to be modelled and drawn rather than spend hours marking up.
Uffe Graaskov Ravn
Gabriel has been a member of my structural design group for the tower foundation of the 1915 Cannakele Bridge in Turkey. All drawing production has been done in the 3D program Tekla where Gabriel has been lead. Gabriel has outstandig level as BIM modeller, works very hard and in addition he has a solid understanding of steel structures and concrete structures. This combination makes Gabriel very valueable and I will give Gabriel my best recommendation.
Barry Magee
I enjoyed working with Gabriel while at Atkins together. Gabriel is a very capable BIM modeller with the advantage of having a good grasp of general engineering principles. Hence you can explain what needs to be modelled and drawn rather than spend hours marking up.
Credentials
-
C# for Unity Game Development
LinkedInMar, 2021- Sep, 2024 -
Unity 3D 2019 Essential Training
LinkedInFeb, 2021- Sep, 2024
Experience
-
Waldeck
-
Germany
-
1 - 100 Employee
-
BIM Manager
-
Mar 2020 - Present
-
-
-
COWI
-
Civil Engineering
-
700 & Above Employee
-
Tekla Modeller
-
Jan 2018 - Feb 2020
The Çanakkale 1915 Bridge is a suspension bridge under construction situated at the western end of the Sea of Marmara in Canakkale Turkey Province. It will be the longest suspension bridge in the world by its length of main span with 2,023m. The cost of the construction is budgeted to approximately US$ 2.8 billion. Working within 3D Rebar Detailling team on Canakkale project, I am responsible for the preparation of the 3D models and the 2D drawings using TEKLA STRUCTURES software. The Çanakkale 1915 Bridge is a suspension bridge under construction situated at the western end of the Sea of Marmara in Canakkale Turkey Province. It will be the longest suspension bridge in the world by its length of main span with 2,023m. The cost of the construction is budgeted to approximately US$ 2.8 billion. Working within 3D Rebar Detailling team on Canakkale project, I am responsible for the preparation of the 3D models and the 2D drawings using TEKLA STRUCTURES software.
-
-
-
Atkins
-
United Kingdom
-
Engineering Services
-
700 & Above Employee
-
Senior CAD Technician
-
Jan 2015 - Jan 2018
As Senior CAD Technician I was involved in a variety of different projects using TEKLA STRUCTURES, REVIT, AutoCAD and Navisworks: HPC nuclear power station, Digital Air Traffic Control Tower - LCA, VRES facility - METROPOLITAN POLICE etc. As Senior CAD Technician I was involved in a variety of different projects using TEKLA STRUCTURES, REVIT, AutoCAD and Navisworks: HPC nuclear power station, Digital Air Traffic Control Tower - LCA, VRES facility - METROPOLITAN POLICE etc.
-
-
-
Byrne Bros (Formwork)
-
United Kingdom
-
Construction
-
100 - 200 Employee
-
3D RC Modeller
-
Jan 2013 - Dec 2014
As 3D RC Detailer I was involved in a variety of different projects using NEMETSCHEK ALLPLAN: AWE Nuclear Project, Bloomberg Place Project, Padington Rail Station Project, Uttons Drove Waste Water Treatment Plant Project. As 3D RC Detailer I was involved in a variety of different projects using NEMETSCHEK ALLPLAN: AWE Nuclear Project, Bloomberg Place Project, Padington Rail Station Project, Uttons Drove Waste Water Treatment Plant Project.
-
-
Education
-
Gheorghe Asachi Technical University of Iași
Master's degree, Rehabilitation and the Increase of Construction Safety -
Gheorghe Asachi Technical University of Iași
Bachelor's degree, Structural Engineering