Felina Toska
Asset Management Associate at Brook Lane Capital- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Brook Lane Capital
-
Cyprus
-
Investment Management
-
1 - 100 Employee
-
Asset Management Associate
-
Dec 2021 - Present
-
-
-
-
-
Sep 2018 - Dec 2021
-Coordinated all disciplines per project area (structural, architectural, mechanical & electrical) throughout different phases of design development (LOD300 & LOD400) to ensure lean construction process-Prepared BIM model & shop drawing submission schedule to align with project program & construction activities -Measured variations in quantities to support commercial department with claims deriving from consultant’s design updates-Monitored project progress in collaboration with Project Controls Department (4D & 5D BIM)-Led coordination workshops between project stakeholders to solve engineering issues-Estimated team’s manhour requirements to assist in company’s tenders based on drawings & specifications included within corresponding request for proposals-Integrated BIM model with as built data & equipment datasheets and specifications as to deliver handover document required for facility and asset management following construction completion Show less
-
-
-
Jul 2015 - Aug 2018
TAV CCC ARABTEC Joint VentureAbu Dhabi International Airport-Midfield Terminal Project-Evaluated design completeness and constructability by performing meticulous interface and interdisciplinary coordination studies-Enhanced change management strategy by monitoring quantity variations through BIM model utilization based on corresponding design revisions-Administered glass wall, ceiling and furnishing subcontractors as a member of the main contractor’s architectural division-Ensured subcontractors followed design intent, contractual obligations and specs through constant coordination meetings -Communicated BIM implementation plan to respective subcontractors and monitored their deliverables accordingly-Implemented QA/QC processes to fabrication models prior to shop drawing extraction-Developed as built drawing production procedure & generated red line mark up drawings and LOD 500 models based on site condition-Collaborated on a daily basis with commercial, procurement, planning, cost control, construction departments by producing joint reports with regards to engineering activity status & completion Show less
-
-
-
Feb 2014 - Jul 2015
- Practiced on 2D and 3D BIM solutions for structural, architectural, mechanical and electrical disciplines - Developed object orientated information models and implemented the integration process - Identified problems and discrepancies in the design documentation among different disciplines using BIM platforms and raised issues to the engineering/ design team- BIM library development, management and manipulation - BIM integration with project WBS and construction schedules - BIM based design for a commercial building (Multidiscipline design, Sustainability, 3D models, MTO, Construction simulation, Planning, Scheduling, Cost assessment, Visualization, Rendering and Presentation)- In depth orientation on BIM based material take off process Show less
-
-
-
-
Junior Design Architect
-
Jun 2010 - Sep 2011
- Assisted in architectural design and construction drawings for commercial and residential projects - Preparation of detailed drawings and visualization - Construction site visits - Contacted clients and tended to their needs - Coordinated senior staffs’ agenda and meeting - Assisted in architectural design and construction drawings for commercial and residential projects - Preparation of detailed drawings and visualization - Construction site visits - Contacted clients and tended to their needs - Coordinated senior staffs’ agenda and meeting
-
-
Education
-
Heriot-Watt University
Master of Science (MSc), Architectural Engineering -
The American University Of Athens
Bachelor's degree, Architectural Engineering -
CGS | Costeas Geitonas School
High School