Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Water Resources Engineer
      • Jun 2019 - Present
    • Project Engineer II
      • Jul 2013 - Present

      Work with project managers to produce development plans for various commercial projects. My work on these projects has included stormwater design, site grading, utility layout/coordination, roadway design, and conceptual site layout. Through my work at Sambatek, I have become proficient with Civil3D and have further developed my communication skills. Work with project managers to produce development plans for various commercial projects. My work on these projects has included stormwater design, site grading, utility layout/coordination, roadway design, and conceptual site layout. Through my work at Sambatek, I have become proficient with Civil3D and have further developed my communication skills.

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Concrete and Materials Testing Technician
      • May 2012 - Nov 2012

      Worked with Braun Intertec technicians and engineers to ensure adherence to given concrete, soil, noise, and air quality specifications. Responsibilities included: Worked independently to test concrete and soil; Set up noise and vibration monitors and write daily reports; Conduct dust monitoring along construction site and write daily reports Worked with Braun Intertec technicians and engineers to ensure adherence to given concrete, soil, noise, and air quality specifications. Responsibilities included: Worked independently to test concrete and soil; Set up noise and vibration monitors and write daily reports; Conduct dust monitoring along construction site and write daily reports

    • Student Research Assistant
      • Oct 2011 - May 2012

      Set up and prepared materials for experiments; Assisted in the completion of experiments; Construction/fabrication of experiments; Assisted wherever help was needed in the Laboratory Set up and prepared materials for experiments; Assisted in the completion of experiments; Construction/fabrication of experiments; Assisted wherever help was needed in the Laboratory

    • Front Desk Attendant
      • Sep 2008 - Nov 2011

      Welcomed patrons, provided facilities information Welcomed patrons, provided facilities information

    • United States
    • Government Administration
    • 1 - 100 Employee
    • Engineering Intern
      • May 2010 - Aug 2011

      MS4 Inspection of construction sites; Data collection and input for water system infrastructure-GIS, GPS, & AsBuilt; Assistance with pavement management data collection MS4 Inspection of construction sites; Data collection and input for water system infrastructure-GIS, GPS, & AsBuilt; Assistance with pavement management data collection

Education

  • University of Minnesota-Twin Cities
    BS, Civil Engineering
    2008 - 2013

Community

You need to have a working account to view this content. Click here to join now