Arun Sasidharan

Sr. Electrical Site Engineer at PORR QATAR CONSTRUCTION
  • Claim this Profile
Contact Information
Location
Doha, Qatar, QA
Languages
  • English Professional working proficiency
  • Hindi Full professional proficiency
  • Tamil Full professional proficiency
  • Malayalam Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Sr. Electrical Site Engineer
      • Apr 2020 - Present

      Project: Construction Of new Interchange IC3 at Ras BufontasConsultant: WSPClient: ASHGHAL / WSP Project Value: USD 78,000,000 Work Scope related to Package Substation - 1 Nos, Tunnel lighting, EHV Culverts-6Nos , EHV Protection Slab,MV cable - 2200m, LV cable - 4500m, SL cable - 6000m SL Poles - 143 Pcs, G ring Decorative Highmast LED Luminaire replacement - 160 Nos. Cycle path LED replacement- 65Nos, G ring 20m double-arm Light Pole replacement-230Nos, Tunnel LED Light- 2300 Nos Manage and execute Dry utility works related to Electrical, Instrumentation & SCADA, ITS, and Street lighting for roads, tunnels, underpasses, Subways, Pumping stations & Combined utility buildings.Manage subcontractors in a timely manner to achieve the goal as per planning with total emphasis on HSE requirements and standards.Ensure proper coordination with interdependencies and project interfaces for the smooth execution of the project.Kahramaa (Qatar Electricity & Water Corporation) coordination with engineers for all the activities related to Package Substation, EHV, MV, and LV including SIS & LOA PermitLiaise with PWA O&M (DNDD, RMD) for the detailed design authority approvals and technical concerns that arise during site executionPrepare Material Bill of Quantity as per approved drawings and support procurement dept for the material selection and approval from authorities.Prepare and Manage Subcontractor's INRs and coordinate with consultant for the site inspection (INR).Liaise with site engineers and inspectors to provide technical support and assistance to resolve the site-related issue and issue RFI if required.Prepare Method statement, Inspection Test Plan, Material submittal, etc for the project.Ensure that the site activities are in line with QCS specifications & standards and the latest approved drawings.Coordinate with the Handover department for the Site inspection and Snag close out to expedite NOC from relevant authorities.

    • Türkiye
    • Construction
    • 700 & Above Employee
    • Sr Electrical Site Engineer
      • Dec 2016 - Mar 2020

      Consultant : Parsons International Client : AshghalProject: P059 Design and Construct Service Road Enhancement to North Road Project: P017 East Industrial Road Project.Project Value: USD 200.000.000 Prepare and Monitor Sub Contractor’s INR & Test report and Coordinate with the client for the site inspection and Closeout.Monitor all activities and installation aspects of the project to ensure compliance with approved and proper standards.Responsible for all site and technical office works (STREET LIGHTING LV MV EHV Cable works starting from the cost estimation to testing and commissioning going through material submittals, shop drawings, RFI & MDS preparation, as-built drawings, and all works related to the site activities.Supervise and execute the work as per the detailed drawings and specifications (QCS 2014) Layout drawings, single line diagrams, layout diagrams, project time schedules, ordering materials required for the job, and work execution. Checking all terminations of control cables as per drawings.Execution of the work according to the approved shop drawing and verify that the coordinates and levels are as per the same Inspecting the site with a consultant inspector, ARE to close out the inspections and get approval Managing the challenging site situations by coordinating with our management and consultant Technical meeting with consultant & client. Coordination with Khahrama & Ashghal for getting approvals.

    • Qatar
    • Construction
    • 1 - 100 Employee
    • Elecrical Site Engineer
      • Apr 2014 - Oct 2016

      Responsible for site and technical office works (STREET LIGHTING & SUBSTATION works) starting from the cost estimation to testing and commissioning going through material submittals, shop drawings, RFI & MDS preparation, as built drawings and all works related to the site activities.Responsible for site activities for executing of Infrastructure works.Technical meeting with consultant & client. Co-ordination with Khahrama & Ashghal for getting approvals.Knowledge of Khahramaa standards and Erection of Kahramaa Substations and installation of fire Alarm systems. Support the Assist project Manager in accomplishing all the goals and targets for the Electrical group at sites.Preparation of Material Submittals.Preparation of PRS with BOQ & Drawings as per Project SpecificationDesign of Lighting system layout including Load Calculation, Responsible for site and technical office works (Infrastructure).Ensure that the delivered material prior to placing them in the stores, are in accordance with specification.Preparing material tracking report.Knowledge for low current system and preparation of shop drawings, as built drawings. Layout drawings, single line diagrams, layout diagrams, project time schedules, ordering materials required for the job, work execution. Checking all terminations of control cables as per drawings. RFI Preparation. Involving in all electrical activities,

    • Electrical Field Engineer
      • Jul 2012 - Mar 2014

      The scope of work for Siemens includes complete project management, design, engineering, manufacturing, testing, supply, and commissioning of the 765/400 kV substations.Execution and supervision of all electrical Erection work like MV, HV panel power cables pulling and termination, CB, CT, Transformer and DB installation, lighting (external) etc.765KV switch yard Erection (Power Grid Cooperation of India.) Erection supervision of Circuit Breaker, Current Transformer, Capacitive Voltage Transformer, Lighting Arrestor, and Isolator used in 765/400 kV SystemOperations on maintenance supervision of 220/400/765kV relay and control panels.Supervision of control panel wiring, working of various relay types and other equipmentControl & Power Cable Laying & Termination supervision.Submit daily and monthly operation and maintenance reports to the Station Engineer.Technical meeting with consultant & client400KV switchyard Erection (Power Grid Cooperation of India.)Responsible for Earthing In charge of 765/400KV substation.Support the Asst project Manager in accomplishing all the goals and targets for the Electrical group at sites.Material SegregationCost effective distribution of manpowerSupervision of control panel wiring, working of various relay & power Cables Laying,Testing.Control & Power Cable Laying & Termination.Sub-Station Earthing System and Aluminum Bus bar Erection.Coordination with Safety Engineers and ensuring the safety and welfare of all on-siteemployeesSupervision of control and relay panels ErectionErection & Maintenance supervision of 400/220 kV Transformer, Current Transformers,Potential Transformers, Circuit Breakers, Isolators & various other ElectricalEquipment.Collect the Tender drawing, Specifications & cross-check with the contract documentAttend the technical & coordination meeting.Submit daily and monthly operation and maintenance report to the Station Engineer

    • Electrical Site Engineer
      • Aug 2009 - Jun 2012

      400kv Switchyard Erection at DGEN- Mega Power Project 1200MW, Gujarat, India.Main Contractor- Siemens India Ltd.Client – Torrent Power Responsible for site activities for executing 400KV Switchyard Erection works.Technical meeting with the main contractor.Support the Assist Project Manager in accomplishing all the goals and targets for the Electrical group at sites.Preparation of Material Submittals.Preparation of PRS with BOQ & Drawings as per Project SpecificationRFI & MDS Preparation and Inspections.Design of Lighting system layout including Load CalculationResponsible for site and technical office works (Infrastructure).Ensure that the delivered material prior to placing them in the stores are in accordance with specifications.Preparing material tracking reportKnowledge of low current system and preparation of shop drawings, and as-built drawings. Layout drawings, single line diagrams, layout diagrams, project time schedules, ordering materials required for the job, and work execution. Checking all terminations of control cables as per drawings.Involved in all electrical installation works.LT & HT under Ground Cable Laying Works.Operation, and maintenance of HT and LT equipment's such as power transformers,Vacuum Circuit Breakers, SF6 circuit Breakers, Line isolators, Air Brake Switches,Current Transformers, Potential Transformers, Bus couplers, etcSupervision of OHL conductor string & jump ring workSupervision of control panel wiring, working of various relay types and other equipmentSub-Station Earthing System and Aluminum Bus bar Erection.

Education

  • KCG College of Technology
    Bachelor's degree, Electrical and Electronics Engineering
    2005 - 2009
  • KCG College Of Technology
    Bachelor of Engineering (B.E.), Electrical and Electronics Engineering
    2006 - 2009
  • Sri Sai Ram Polytechnic College
    Diploma of Education, Electrical and Electronics Engineering
    2003 - 2006

Community

You need to have a working account to view this content. Click here to join now