Ali Sinan Başar

Director Of Operations at ENTT ENERGY Contracting and Trade INC.
  • Claim this Profile
Contact Information
Location
Ankara, Turkey, TR
Languages
  • Türkçe Native or bilingual proficiency
  • İngilizce Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Welding Engineering
    GSI SLV Duisburg
    Mar, 2008
    - Sep, 2024

Experience

    • Director Of Operations
      • Feb 2019 - Present

      . Engineering Study for the Boiler and FGD Optimization of EnerjiSA Tufanbeyli 3 x 150 MWe local lignite fired coal fired power plant

    • Sweden
    • Professional Services
    • 700 & Above Employee
    • Energy Department Manager
      • Jan 2015 - Feb 2019

      .Yalova AKSA Akrilik Kimya Sanayi 100 MW Coal Power Plant Steam Turbine & Generator Replacement Project.ICTAS 6 MW Biomass Power Plant Project Feasibility.Doğanlar Holding Biogas Investment Feasibilty. KRK Holding Biomass Project Feasibility and Basic Engineering Works

    • Türkiye
    • Civil Engineering
    • 1 - 100 Employee
    • Senior Business Development Engineer
      • Jan 2014 - Jan 2015

      Coordinating EPC proposal periods of Combined Cycle, Coal Fired, Biomass Power PlantsTracking the tendering websites and bulletin regularlyPreparing PQ documentationPreparing tendering documentation and pricing according to contract

    • Project Control Engineer
      • May 2009 - Feb 2014

      EUAS Ambarlı Power Plant is a Turkish state-owned power complex with 5 fuel-oil and 3 gas fired power plants. Units 4 & 5 Rehabilitation Project is a " Full Repowering by CCPP Cenversion " Project that is a "first of its kind " Project in Turkey and is equalled in magnitude and complexity by only a handful of worlwide examples.Mentioned Project covers complete replacement of the orginal fuel fired boiler of a steam plant with a combination of Gas Türbine - Generating Sets; Re-Engineering & Modification of the existing steam turbines for performance optimization / enhancement, beyond customary implementation of repair, rehabilitation and general life - extension measures. As a result of these activities total installed capacity was raised from 270 MW to 816 MW. Net efficiency was improved from %35 to %56.My assignments for the AmbarlıUnits 4&5 Rehabilitation Project are as follows,Contract negotiations with end client(EÜAŞ)Request for Proposal preparation according to contractNegotiation on RFPs with OEMs.Maintaining the coordination between the OEMs and site management.Inspecting the HRSG manufacturing which was done by AE&E according to ASME Codes.Inspecting the auxiliary boiler which was manufactured by Yildiz Kazan.Managing the Steam Turbine inspections which was done by ALSTOM.Finding solutions to problems by internalization root cause analyses.Inspecting the overhauling steps of Steam Turbine which was performed by Turbocare.Preparing, gathering operation and maintanence manuals for the overall plant.Preparation, gathering and performing of function tests for the overall plant systems.Negotiation of performance tests with Bilfinger Babcock.Negotiating and completing of open items in punch lists during provisional acceptance with end client.Coordinating performance tests with Bilfinger Babcock and End Client(EUAS)Participation till the end of provisional site acceptance.

    • Quality Manager
      • Feb 2009 - May 2009

      I was assigned to get the ASME certification for Prokon Manufacturing and Erection Company working as the Quality Control Manager during the certification of Uand S stamps according to ASME Sections I, Section VIII Div. 1 of the ASMEBoiler and Pressure Vessel Code and ASME B31.1 for Pressure Piping.

    • Manufacturing Engineer
      • Sep 2007 - Feb 2009

      My main duty was planning the steps of manufacturing according to workload and schedule.I prepared forms of work orders according to ISO 9001 :2000.I certified welders according to EN 287 and control their work.I prepared quality documents according to end client's demands.During these activites I had chance to manufacture parts for the Cimpor Hasanoglan Cement Plantand Sanko Energy Hydroelectric Power Plant including rotary kilns, coal kilns, bunkers and penstockpiping.

    • United States
    • Trainee
      • Aug 2005 - Sep 2005

      I had the opportunity to experience manufacturing of steel construction units and machine elements

    • Mining
    • 700 & Above Employee
    • Trainee
      • Jul 2003 - Aug 2003

      Examining steel production steps

Education

  • Orta Doğu Teknik Üniversitesi / Middle East Technical University
    Master of Engineering - MEng, Welding Engineering Technology/Technician
    2008 - 2008
  • Orta Doğu Teknik Üniversitesi / Middle East Technical University
    Bachelor of Engineering (B.E.), Metallurgical Engineering
    2002 - 2007
  • east newton high school
    High School, Science
    2001 - 2002
  • gazi anatolian high school
    honour, math and science
    1996 - 2001

Community

You need to have a working account to view this content. Click here to join now