Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • SMSTS AND PRINCE2
    -

Experience

    • Project Planner
      • Jul 2020 - Present
    • United Kingdom
    • Defense and Space Manufacturing
    • 700 & Above Employee
    • Project Controller
      • Mar 2018 - Feb 2020
    • France
    • Defense and Space Manufacturing
    • 700 & Above Employee
    • Senior Planning Engineer
      • Feb 2016 - Mar 2018

      Developed, monitored and control the programme used to manufacture and prepare the voyage of the Exomars Rover to Mars. Developed, monitored and control the programme used to manufacture and prepare the voyage of the Exomars Rover to Mars.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Construction Planner
      • Feb 2015 - Feb 2016

      - Developed and controlled various ASTA programmes for MOD (Aspire Defence) Bulford Camp, Fordbridge Fire Station, Gloucester Archive, Matthews Green Primary school etc Jobs - Created Tender Programmes which won Bids for new jobs - Assumed Site Manager Duties took ownership of management of site and procurement - Developed and controlled various ASTA programmes for MOD (Aspire Defence) Bulford Camp, Fordbridge Fire Station, Gloucester Archive, Matthews Green Primary school etc Jobs - Created Tender Programmes which won Bids for new jobs - Assumed Site Manager Duties took ownership of management of site and procurement

    • United Kingdom
    • Utilities
    • Planning Engineer - Costain Project Control Resource Framework CTO Nuclear Generation/New Build
      • Jun 2014 - Feb 2015

      Supporting the Hinckley Point C (HPC) design team with project control and planning activities for the Effluent waste treatment plant, Emergency Diesel Generator, Ultimate Diesel Generator and Conventional Island Auxiliary Building’s Civil layout design. • I Supported the Design Team with planning and scheduling activities for the design and implementation (studies, procurement support, assembly and commissioning) of projects involving the Nuclear Islands and Control Systems. • I developed a robust level 3 baselined Interface programme • I Developing tender and for construction programmes for the Waste Treatment and Processing Plant, Emergency & Ultimate Diesel Generator and the Civil & Layout Projects. • I championed the integration of multiple programmes into the main working programme for the HPC project. • I saved the department millions of pounds worth of resources in man hours and pound sterling by developing, monitoring & controlling a cost and resource loaded, logic linked, baselined plan for the project in accordance with CTO Programme Office processes. • I developed the programmes in line with Investment Delivery processes and templates. • I analyzed project using Cost Performance Index and Schedule Performance Index, by comparing Earned Value with Planned Value and Actual Cost. Show less

    • United Kingdom
    • Utilities
    • 1 - 100 Employee
    • Project Planner (Primavera) - Power Station Programme Hitachi GE Menter Newydd 2800MW Nuclear New Bu
      • Jan 2014 - Jun 2014

      Project: Site Prep and Clearance for the Wylfa Menter Newydd Nuclear Power Plant Project (archeological activities, construction of roads network, construction of a 5000 capacity accommodation blocks. • Developed schedules based on construction team plans, resource load schedules, analyse float paths and assessed schedule status. • I helped to add a 6 month float to a project by Carrying out a thorough Critical Path Analysis to evaluate the activities / milestones in the critical path and identify, well in advance, activities that could slippage, review and mitigate the causes and effects of such slippages, highlight them early and provide mitigation measures. • Collaborated with the Project Manager and the Project Team to Integrated different subcontractors programmes into the Master Schedule. • Escalated issues/concerns to the PM that may cause delay or overspend on the project • Gathered information from the project team to generate project monthly dashboard and earned value report for top management and client. • Contributed to the lessons learnt process by providing constructive feedback at project close out. Show less

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Site Manager
      • Dec 2010 - Jan 2014

      Project: The Aldgate Place London (Site Prep and Clearance and Driving of contiguous wall and load bearing piles for 3 blocks of 23 storeys residential apartment) Project: The Aldgate Place London (Site Prep and Clearance and Driving of contiguous wall and load bearing piles for 3 blocks of 23 storeys residential apartment)

    • United Kingdom
    • Spectator Sports
    • 1 - 100 Employee
    • Site Manager
      • Jun 2010 - Dec 2010

      Project: Media Centre, Transport Hub & Multi Storey Car Park Construction Project: Media Centre, Transport Hub & Multi Storey Car Park Construction

    • United Kingdom
    • Civil Engineering
    • 200 - 300 Employee
    • Site Manager
      • Feb 2010 - Jun 2010

      Project: Costain/Skanska London Power Tunnel (Rail Replacement, SCL application, tunneling activities and TBM reception prep) Installation, testing and commissioning of all equipment, infrastructure and systems required for the tunnel and substation upgrades. Project: Costain/Skanska London Power Tunnel (Rail Replacement, SCL application, tunneling activities and TBM reception prep) Installation, testing and commissioning of all equipment, infrastructure and systems required for the tunnel and substation upgrades.

Education

  • Cranfield University
    MSc, Energy from Waste
    2017 - 2020
  • Coventry University
    MSc., Construction Management
    2010 - 2011
  • University of Lagos
    B.Sc., Chemical Engineering

Community

You need to have a working account to view this content. Click here to join now