adesola okunoren MCIOB
Project Planner at COMA HPC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Credentials
-
SMSTS AND PRINCE2
-
Experience
-
-
Project Planner
-
Jul 2020 - Present
-
-
-
BAE Systems
-
United Kingdom
-
Defense and Space Manufacturing
-
700 & Above Employee
-
Project Controller
-
Mar 2018 - Feb 2020
-
-
-
Airbus Defence and Space - Intelligence
-
France
-
Defense and Space Manufacturing
-
700 & Above Employee
-
Senior Planning Engineer
-
Feb 2016 - Mar 2018
Developed, monitored and control the programme used to manufacture and prepare the voyage of the Exomars Rover to Mars. Developed, monitored and control the programme used to manufacture and prepare the voyage of the Exomars Rover to Mars.
-
-
-
Lakehouseplc
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Construction Planner
-
Feb 2015 - Feb 2016
- Developed and controlled various ASTA programmes for MOD (Aspire Defence) Bulford Camp, Fordbridge Fire Station, Gloucester Archive, Matthews Green Primary school etc Jobs - Created Tender Programmes which won Bids for new jobs - Assumed Site Manager Duties took ownership of management of site and procurement - Developed and controlled various ASTA programmes for MOD (Aspire Defence) Bulford Camp, Fordbridge Fire Station, Gloucester Archive, Matthews Green Primary school etc Jobs - Created Tender Programmes which won Bids for new jobs - Assumed Site Manager Duties took ownership of management of site and procurement
-
-
-
EDF Energy
-
United Kingdom
-
Utilities
-
Planning Engineer - Costain Project Control Resource Framework CTO Nuclear Generation/New Build
-
Jun 2014 - Feb 2015
Supporting the Hinckley Point C (HPC) design team with project control and planning activities for the Effluent waste treatment plant, Emergency Diesel Generator, Ultimate Diesel Generator and Conventional Island Auxiliary Building’s Civil layout design. • I Supported the Design Team with planning and scheduling activities for the design and implementation (studies, procurement support, assembly and commissioning) of projects involving the Nuclear Islands and Control Systems. • I developed a robust level 3 baselined Interface programme • I Developing tender and for construction programmes for the Waste Treatment and Processing Plant, Emergency & Ultimate Diesel Generator and the Civil & Layout Projects. • I championed the integration of multiple programmes into the main working programme for the HPC project. • I saved the department millions of pounds worth of resources in man hours and pound sterling by developing, monitoring & controlling a cost and resource loaded, logic linked, baselined plan for the project in accordance with CTO Programme Office processes. • I developed the programmes in line with Investment Delivery processes and templates. • I analyzed project using Cost Performance Index and Schedule Performance Index, by comparing Earned Value with Planned Value and Actual Cost. Show less
-
-
-
Horizon Nuclear Power
-
United Kingdom
-
Utilities
-
1 - 100 Employee
-
Project Planner (Primavera) - Power Station Programme Hitachi GE Menter Newydd 2800MW Nuclear New Bu
-
Jan 2014 - Jun 2014
Project: Site Prep and Clearance for the Wylfa Menter Newydd Nuclear Power Plant Project (archeological activities, construction of roads network, construction of a 5000 capacity accommodation blocks. • Developed schedules based on construction team plans, resource load schedules, analyse float paths and assessed schedule status. • I helped to add a 6 month float to a project by Carrying out a thorough Critical Path Analysis to evaluate the activities / milestones in the critical path and identify, well in advance, activities that could slippage, review and mitigate the causes and effects of such slippages, highlight them early and provide mitigation measures. • Collaborated with the Project Manager and the Project Team to Integrated different subcontractors programmes into the Master Schedule. • Escalated issues/concerns to the PM that may cause delay or overspend on the project • Gathered information from the project team to generate project monthly dashboard and earned value report for top management and client. • Contributed to the lessons learnt process by providing constructive feedback at project close out. Show less
-
-
-
Barratt Developments plc
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Site Manager
-
Dec 2010 - Jan 2014
Project: The Aldgate Place London (Site Prep and Clearance and Driving of contiguous wall and load bearing piles for 3 blocks of 23 storeys residential apartment) Project: The Aldgate Place London (Site Prep and Clearance and Driving of contiguous wall and load bearing piles for 3 blocks of 23 storeys residential apartment)
-
-
-
LOCOG (London Organising Committee Of The Olympic & Paralympic Games)
-
United Kingdom
-
Spectator Sports
-
1 - 100 Employee
-
Site Manager
-
Jun 2010 - Dec 2010
Project: Media Centre, Transport Hub & Multi Storey Car Park Construction Project: Media Centre, Transport Hub & Multi Storey Car Park Construction
-
-
-
Joseph Gallagher Limited
-
United Kingdom
-
Civil Engineering
-
200 - 300 Employee
-
Site Manager
-
Feb 2010 - Jun 2010
Project: Costain/Skanska London Power Tunnel (Rail Replacement, SCL application, tunneling activities and TBM reception prep) Installation, testing and commissioning of all equipment, infrastructure and systems required for the tunnel and substation upgrades. Project: Costain/Skanska London Power Tunnel (Rail Replacement, SCL application, tunneling activities and TBM reception prep) Installation, testing and commissioning of all equipment, infrastructure and systems required for the tunnel and substation upgrades.
-
-
Education
-
Cranfield University
MSc, Energy from Waste -
Coventry University
MSc., Construction Management -
University of Lagos
B.Sc., Chemical Engineering